Empire Comfort Systems VFD32FB0F-1, VFD32FB2DL-1 Clearances, Firebox Installation Instructions

Page 4

CLEARANCES

Sidewall Clearances: The clearance from the inside of the firebox to perpendicular combustible side wall should not be less than 6". See Figure 1.

Firebox Side and Back Clearances: The firebox outer casing side and back flanges are zero clearance to combustibles.

Top Framing and Finishing: Combustible framing may rest on top of standoffs. Combustible finishing materials may extend to the top standoff screws on the front edge of the outer wrap. See Figure 2.

Ceiling Clearances: The ceiling height should not be less than 42" from the top of the hood. See Figure 3.

Mantel Clearances: Vent free firebox models must use the hood supplied with the firebox, or one of the optional hood kits available for each model. If a combustible mantel is installed, it must meet the clearance requirements detailed below.

Grate Clearance: The minimum clearance between the front legs of the grate and front edge of the firebox is 2".

Leave at least 36" clearance from the front of the firebox.

COMBUSTIBLE

MATERIALS ALLOWED

IN SHADED AREAS

FIREBOX

(TOP VIEW)

FRONT FACE (SIDE)

3”

 

 

 

 

MAX.

45°

6”

PERPENDICULAR

SIDE WALL

Figure 1

CEILING

 

 

 

12”

 

 

 

MAX

 

 

 

10”

 

 

 

MANTEL

24 ½”

 

 

 

42”

10”

8”

COMBUSTIBLES

MIN.

22”

ALLOWED

(CEILING TO

6 ½”

 

 

TOP OF HOOD)

 

 

 

20”

 

 

 

5”

 

 

 

13”

 

18”

 

 

3 ½”

 

 

 

84”

 

 

16”

 

 

2”

MIN.

 

 

14”

(CEILING TO FLOOR)

 

 

 

 

3/4”

2 X 4 HEADER

STAND OFF

FIREBOX

COMBUSTIBLE

FINISHED WALL

OR MANTEL

FINISH WITH TRIM KIT OR NON-COMBUSTIBLE MATERIAL AS DESIRED.

 

12 ½”

 

11 1/2”

 

MIN.

 

0”

3/8” COMBUSTIBLE

 

CLEARANCE REQUIRED

 

FROM TOP EDGE

 

OF FIREBOX

HOOD

FIREBOX

FACE

Figure 3

Figure 2

Clearances to combustibles

FIREBOX INSTALLATION INSTRUCTIONS

Any vent-free Gas Log Heater must be “For use with approved ANSI Z21.11.2 unvented room heater.”

Follow and complete the installation instructions of the gas log set and the requirements of this firebox.

Check all fittings for leaks before lighting the gas log set.

In planning the installation for the firebox, it is necessary to determine where the unit is to be installed and whether optional accessories are desired. Gas supply piping should also be planned at this time.

A gas shut off must be in this line.

Page 4

23200-0-1206

Image 4
Contents Installation Instructions Effective Date DecemberTable of Contents Important Safety Information Instructions to InstallerQualified Installing Agency IntroductionFirebox Installation Instructions ClearancesClearances to combustibles Gas shut off must be in this lineDeluxe Vent-Free Firebox Framing Dimensions in inches Planning Your InstallationFirebox Framing Firebox Installation Instructions Installing Hood Extended Hoods GAS Line ConnectionFinishing Standard Screwdriver Sharp edgesFresh AIR KIT Parts List Index Quantity Description Supplied Completion of Air Kit installation Optional Single Speed Blower Installation Instructions WiringSee , Connection a See , Connection BBlower Motor Blower WheelsJunction BOX Wiring Installation Instructions MaintenanceParts List HOW to Order Repair Parts Parts View Accessories Variable Speed Control KitBrick Liners Fresh Air KitExtended 4 Hoods LouversBottom Trim Strip Decorative Door Kits