Regency S2400M STEP-BY-STEP Chimney Connector Installation, Leg and Bottom Shield Assembly

Page 11

INSTALLATION

Leg and Bottom Shield Assembly

F2400M & S2400M

Bottom Shield

020-911

Legs (set of 4)

 

Steel - Painted Black

850-125

Cast - Painted Black

850-126

Cast - Gold Plated

850-127

The instructions below apply to the steel leg, painted cast leg and the gold plated cast leg. It will be easier to attach the legs to the stove if the stove is tipped on its back (preferably on a soft surface to prevent scratching). Ensure to be extremely careful when tipping stove.

1)Remove the 4 bolts from underside of the base of the pedestal and discard. Also remove cover plate and put to the side.

2)Line up the heat shield with the bottom of the unit.

3)Start threading the bolt and washer (supplied with the bottom shield) for about 1/4 of the way through the leg with the washers being underneath the legs. Ensure that the legs are properly aligned with heat shield and tighten the bolts.

4)Level the stove by adjusting the levelling bolts in the bottom of each leg.

5)Reinstall cover plate.

6)Install logo plate onto heat shield by placing in 2 holes as shown in diagram.

If you are installing outside combustion air, bend the tabs out 90 degrees. Pipe fresh air into the bottom shield by using a minimum 4" duct pipe with a mesh grill at the outside termination. At- tach the pipe to the 2 tabs with screws.

STEP-BY-STEP

CHIMNEY AND

CONNECTOR

INSTALLATION

Note: These are a generic set of chimney in- stallation instructions. Always follow the manufacturers own instructions explicitly. Verify the Minimum Recom- mended Heights for Woodstove Flue (Table 1 in the Installation section).

1)With your location already established, cut and frame the roof hole. It is recommended that no ceiling support member be cut for chimney and support box installation. If it is necessary to cut them, the members must be made structurally sound.

2)Install radiant shield and support from above.

3)Stack the insulated pipe onto your finish support to a minimum height of 3 feet above the roof penetration, or 2 feet above any point within 10 feet measured horizontally. There must be at least 3 feet of chimney above the roof level.

Note: Increasing the chimney height above this minimum level will sometimes help your unit to “breathe” better by allowing a greater draft to be cre- ated. This greater draft can decrease problems such as, difficult start-ups, back-smoking when door is open, and dirty glass. It might be sufficient to initially try with the minimum re- quired height, and then if problems do arise add additional height at a later date.

4)Slide the roof flashing over your chimney and seal the flashing to the roof with roofing compound. Secure the flashing to your roof with nails or screws.

5)Place the storm collar over the flashing, sealing the joints with a silicone caulking.

6)Fasten the raincap with spark screens (if required) to the top of your chimney.

7)For optimum efficiency when installing into a masonry chimney, size accordingly, i.e. the 6" (152mm) flue dia. is 28.28 sq.in.

8)To complete your chimney installation, install the double wall connector pipe from the stove’s flue collar to the chimney support device.

9)If you are using a horizontal connector, the chimney connector should be as high as possible while still maintaining the 18" (457mm) minimum distance from the hori- zontal connector to the ceiling.

10)NOTE: Residential Close Clearance and Alcove installations require a listed dou- ble wall connector from the stove collar to the ceiling level.

The diagrams below illustrate one way to in- stall your unit into a standard ceiling or with a horizontal connector. Check with your dealer or installer for information on other options available to you.

Standard Ceiling Installation

Horizontal Installation

Regency Freestanding Woodstove

11

Image 11
Contents 02/15/06 Freestanding WoodstoveModular Parts Regency Fireplace ProductTable of Contents Safety Label for F2400M Safety Label245 Safety Label for S2400M2006 2005Unit Dimensions InstallationF2400M, S2400M Residential InstallationModular Installation Options Modular Part Things to consider when choosing optionsMinimum Clearance to Combustible Materials Residential Installation C Vent Single WallRoom AIR Floor Protection Minimum Alcove Clearance to Combustible Materials815-555 Stove Assembly Prior to InstallationAirmate Assembly for F2400M S2400M Side Shield AdjustmentLeg and Bottom Shield Assembly STEP-BY-STEP Chimney Connector InstallationFactory Built Chimney Masonry ChimneyMasonry Fireplace Method a 12 304.8 mm Clearance to Combustible Wall Member Combustible Wall Chimney Connector PASS-THROUGHSExample b Recommended Heights for Woodstove FlueRecommended Flue Height Elevation Example aMobile Home Installation Canadian Installations Listed Components For Mobile Home InstallationFlue Baffle Secondary AIR Tube Installation InstallationDoor Handle Brick InstallationSTEP-BY-STEP Optional Accessories Installation Glass InstallationBlower/Fan Wiring Diagram First Fire Operating InstructionsOperating Instructions Draft ControlASH Disposal Safety GuidelinesSafety Precautions FAN OperationMaintenance Part# Description Parts ListF2400M Stove Main Assembly S2400M Step Stove Main Assembly Parts ListPEDESTAL, Bottom Shield & LEG Options Firebrick Regency Freestanding Woodstove Warranty Lifetime WarrantyInstaller Please complete the following information