Figure #7
Steam Plumbing Arrangement Below Humidifier
min. 2º | min. 10º |
|
3. | Avoid condensate traps in the hose, see Figure |
| #8. |
4. | Use wall clips (p/n |
| steam and condensate hoses and maintain 1” |
| clearance from the wall. The connection can also |
| be made with ¾” copper pipe with 1” thermal |
|
| 12”min.(300mm) |
| (150 | mm) |
min |
| |
|
| |
6” |
|
|
min. 10º
|
| mm) | mm) |
| (300 | (300 | |
12” |
| ||
| 12” | ||
|
|
Nortec Humidifiers
All Models
insulation rated for 215F (101°C). |
CONDENSATE HOSE (supplied)
Under normal circumstances, when the steam distribution nozzle is above the top surface of the humidifier, the condensate hose is routed back to the top of the humidifier and fed through the opening provided to the fill cup. Cut the ends diagonally and simply insert ½" in the appropriate hole in the top of
To be 2” (50mm) longer |
|
|
then duct static pressure | min. 2º | min. 10º |
or minimum. |
the humidifier. Install a 3/8” copper tubing trap at the lowest point in the condensate system. Connect to the
min. 20 %
|
|
|
|
|
|
|
|
|
| mm) |
|
| |
|
|
|
|
| ||
min. 20 % | (300min.12” |
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| (150 | mm) | ||||
min |
|
|
|
| ||
|
|
|
|
|
| |
6” |
|
|
|
|
|
|
mm) | mm) | |
(300 | (300 | |
. |
| 12” |
| 12” | |
Rmin |
| |
| Nortec Humidifiers | |
|
| All Models |
| (150 | mm) |
min |
| |
|
| |
6” |
|
|
hose with a clamp Figure #6.
BLOWER PACK CONNECTION
The RESDELUX humidifier can be purchased with an optional blower pack for direct room humidification. The blower pack is field installed on the RESDELUX humidifier cabinet or located remote from the RESDELUX humidifier.
The blower pack is powered directly from the RESDELUX control board. It cannot be powered separately.
STEAM HOSE INSTALLATION
1.The length of the steam hose must not exceed 4’ (1.2m).
2.It must not be restricted in any way (i.e. - a kink resulting from a short radius bend).
Figure #8
Steam Hose Routing
Avoid Water Traps
Avoid kinks
Proper
Slope
Gentle
Sweeping
Turns
On a call for humidity, blower fans are powered and remain powered for about two minutes after steam production is interrupted.
Cabinet Mounting of the Blower Pack
The RESDELUX blower pack comes with a basic hardware kit. The kit contains all the hardware required to cabinet mount the blower pack.
NOTE: Mounting of the blower pack must be performed before the RESDELUX humidifier is installed and wired.
1.Remove the RESDELUX humidifier and blower pack from their shipping boxes.
2.Place the RESDELUX humidifier upright on a flat surface.
3.Remove the 7/8” knockout on the top of the RESDELUX humidifier. There are two knockouts, select the one closest to the large opening.
- 3 -