Nortec Industries NHDI, SETC, NHSC installation manual Mounting the Links 2 Assembly

Page 8

B.MOUNTING THE LINKS 2 ASSEMBLY

(1)Refer to Figure 2 for the mounting location of the Nortec LINKS 2 Bracket on the GS or SE unit. If pilot holes for the mounting screws are not already present on the humidifier frame follow steps 2 and 3. If pilot holes are present then disregard steps 2 and 3.

(2)Using the bracket assembly as a template, mark locations of pilot holes on the GS/SE humidifier frame.

(3)Using 1/8” drill bit, drill pilot holes for the bracket mounting screws.

(4)Install the bracket assembly using 8-32x ½” hex-drive screws. Be sure to route the power wires for the I/O Controller-E module through the cutout on the upper right- hand corner of the bracket, as illustrated in the following figure. After running wires behind bracket, route the power leads into the main wire track.

Screw

Location

Figure 2. LINKS 2 Bracket Placement

10-10

Page 3 2008-02-15

Image 8
Contents Retrofit Instructions for Gstc / Setc / Nhtc Nhdi / Nhsc Proprietary Notice Liability Notice Table of Contents Links Field Installation A SE-50Configuring the Humidifiers Links Field Conversion GSTC/SETC LAN Mounting the Links 2 Assembly Configuring the Humidifiers Links Field Conversion Nhtc Module Hook Position Configuring the Humidifiers Links Field Conversion NHDI/SC Supply OnLine Module LAN Router or Switch BACnet/IP Use 8-32 screws Use 8-32with nuts screw Only Nhdi Links 2 Slave Installation 10-30 Warranty Authorized Agent