Redring SB
| Contents |
Subject | Page |
General Product Operation | ......................................................................2 |
Spares Diagram and List | 3 |
Unit Dimensions | 3 |
Problem Solving | 4 |
Tank Access | 5 |
Parts Replacement Guide | 5 - 6 |
Intentionally Blank | 7 |
AEP Address | 8 |
The General Operational Process
1.After fixing to wall and checking all connections, turn on power and water together.
2.The solenoid valve will now open and fill the tank until it reaches the low water level sensor.
3.When the low water level sensor is contacted, the filling process stops and the heating cycle starts, the heating will continue until the water reaches approximately
4.Once this temperature is reached the heating stops and filling restarts, this process of heat/fill/heat/fill continues until the top water level sensor is reached. When water makes contact with the high water level sensor, the PCB isolates the filling cycle from this function, and the element controlled by the PCB remains in circuit to monitor for any heat top up’s that may be required.
5.If any subsequent water is used and the unit drops away from the high level water sensor, the heat/fill/heat /fill process restarts until water is back at the high level water sensor and at maximum temperature.
Page 2 of 8