Trion T5200 manual III. Installation Read Thoroughly, Ducting Application

Page 4

and is accompanied with a continual snapping or arcing noise, the air cleaner requires attention and may need to be cleaned.

Cell Access Door Knobs (C): The cell access doorknobs are located on the door near the intake end of the unit. To open the cell access door, turn the knobs counter clockwise until it releases from the cabinet.

Arcing (snapping or cracking noise): An occasional arcing noise may be emitted from the air cleaner. This is a normal occurrence caused by exceptionally large pieces of dirt, etc., entering the collecting elements. In addition, an arcing noise accompanied by a flickering of the indicating light may be noticed after washing the cells. Should this occur, allow more drying time. Also, see “Troubleshooting Chart”, for additional causes of arcing.

The louvers on the grill are adjustable so the direction of airflow can be controlled as desired.

NOTE: The unit is equipped with an interlock switch for your safety. The unit will not operate if the cell access door is not closed securely.

NOTE: The blower access door is not protected by an interlock switch. Do not attempt to operate the unit unless the door is fastened securely.

DUCTING APPLICATION

The T5200 air cleaner is designed for free hanging applications or for limited duct system applications. The duct systems must be carefully designed to keep the external static pressure to a minimum while still moving the required amount of air. Some added static pressure can be overcome by adjusting the blower drive pulleys or using a more powerful motor. Capture hoods and duct design information may be obtained from the Industrial Ventilation Handbook or from your local Trion representative.

To maintain the selected cleaning efficiency, it is important to assure that the total air volume (capacity in CFM) is uniformly distributed across the entire face area of the unit. The metal mesh filters, perforated plate or mist suppressors; provide some resistance to effect even air distribution. However, since most air ducts are designed to handle air velocities greater than the rated velocity of the air cleaner, it is necessary to properly transition any attached ducting. If possible, a contraction

ratio of 1 in 3 (approximately 20°) should be maintained. If space prohibits, turning vanes, air baffles or other means may be utilized. Ducting – where attached to the cabinet collars – should be gasketed, caulked or otherwise made watertight.

III.INSTALLATION – READ THOROUGHLY

1.Carefully unpack unit from shipping crate or carton and examine for damage in shipment.

2.Remove ionizer/collector cell(s), pre-filters and after-filters.

3.Attach 600 pound test chain to the ceiling joist using:

a.Wood joist – 1/2” –13 eye bolts

b.Metal joist – wrap chain around joist at least twice and secure with 600 pound test connecting link

4.Chain should be cut to allow the unit to hang from a predetermined height from the floor. (Usually 10-12 feet).

5.The unit is equipped with a locator dimple in each corner on the top and bottom and (1) each on the approximate mid point edge of the top and bottom.. Using the dimples as a guide, drill (6) 19/32” dia. Holes that will be required for mounting the eye bolts, which are attached to the suspension chain.

6.Screw a ½”-13 x 1-1/4” long eye bolt (or larger) in each hole. The T5200 unit is supplied with weld nuts at each dimple location.

7.Using 1/2” connecting links, attach unit to chain. Use turnbuckles on diagonally opposite chains. NOTE: Foul threads on turnbuckles after leveling unit to ensure that the turnbuckle will not "“back off" or loosen and cause the unit to fall.

8.The units can be suspended with the direction of airflow from the right to left. If a left to right airflow is desired, the unit may be flipped over and the eyehooks installed in what was originally the bottom.

4

Image 4
Contents Air Boss Series Table of Contents Specifications II. Preparation for InstallationIII. Installation Read Thoroughly Ducting ApplicationIV. Maintenance Liquid Aerosol Application InstallationsElectrical Installation Check Out for System Start-upReplacement Parts Ordering Information VI. WarrantyVII. Troubleshooting Guide T5200 Problems and Possible CausesT5200 Troubleshooting Guide Page Page Page Page Page Page

T5200 specifications

The Trion T5200 is an advanced piece of technology designed for high-performance computing tasks, meeting the demanding needs of various industries. This cutting-edge server system is tailored for businesses that require robust capabilities in data processing, storage, and network management.

One of the standout features of the Trion T5200 is its powerful processor options. It is equipped with the latest multi-core processors, providing exceptional processing power that enables simultaneous multitasking. This feature is crucial for applications that demand heavy computational resources, such as machine learning, data analytics, and real-time transaction processing.

In terms of memory, the Trion T5200 supports high-capacity RAM configurations, allowing for enhanced performance during intensive workloads. The system can handle substantial memory demands, ensuring that large datasets can be processed efficiently without bottlenecks. The expandable memory architecture also enables organizations to upgrade their systems as their needs grow.

Storage is another critical aspect of the Trion T5200. The system is equipped with a flexible storage architecture that supports various configurations of SSDs and HDDs. Users can opt for high-speed SSDs to ensure rapid data access and reduced latency or traditional HDDs for larger capacity requirements. The combination of high-performance storage options makes the T5200 ideal for both transactional and analytical workloads.

Networking capabilities are also a highlight of the Trion T5200. It provides multiple high-speed networking interfaces, including support for 10GbE and higher options, which facilitate fast data transfer and robust connectivity. This feature is essential for businesses that rely on cloud computing, virtualization, and expansive data center operations.

The Trion T5200 is designed with energy efficiency in mind. It incorporates advanced power management technologies that reduce energy consumption without compromising performance. This feature not only leads to cost savings but also aligns with the growing emphasis on sustainability in IT infrastructures.

In addition to hardware performance, the Trion T5200 supports advanced security features to protect sensitive data and ensure compliance with industry standards. This includes hardware-based security elements and robust software solutions designed to safeguard against evolving cyber threats.

Overall, the Trion T5200 stands out as a versatile and powerful server system that is built for the future. Its combination of high performance, scalability, and innovative technologies positions it as an ideal choice for organizations looking to enhance their computing capabilities and meet today’s challenges in the digital landscape.