Utica installation manual PEG-C Replacement Parts Heat Exchanger, Wash 5/16 Flat STL ZP

Page 25

PEG-C REPLACEMENT PARTS - HEAT EXCHANGER

ITEM

PART

 

 

ITEM

PART

 

 

#

NUMBER

DESCRIPTION

OTY.

#

NUMBER

DESCRIPTION

OTY.

1

100-2-15.01

E-Left Hand Section

1

13 HW-003.02

NUT-1/4-20 HEX SLT

4

2

100-2-14.01

E-Center Section

 

14 HW-008.01

WASH 5/16 FLAT STL ZP

2

PEG112C - (2),

PEG150 - (3), PEG187 - (4),

 

 

 

PEG 225 -(5),

PEG262 - (6), PEG300 - (7)

 

 

 

3

100-2-13.02

E-Right Hand Section

1

 

 

 

4

HW06901

NUT-5/16-18 WISLOCK

4

(Fully assembled heat exchangers.)

 

5

HW-011.10TIE ROD 1/4X10.25 PEG112 2

10022802

4 SECTION PEG112C

1

 

HW-011.02

TIE ROD 1/4X13 PEG150

 

10022803

5 SECTION PEG150C

1

 

HW-011.04

TIE ROD 1/4X17 PEG187

 

10022804

6 SECTION PEG187C

1

 

HW-011.05

TIE ROD 1/4X19 PEG225

 

10022805

7 SECTION PEG225C

1

 

HW-011.07

TIE ROD 1/4X23 PEG262

 

10022806

8 SECTION PEG262C

1

 

HW-011.08

TIE ROD 1/4X25 PEG300

 

10022807

9 SECTION PEG300C

1

6

PF-007.02

PIPE FIT PLG 2"

1

 

 

 

7

251-1-2.00

J-BOLT 1/4-20X3.5/16

2

 

 

 

8

43300976

NIPPLE 2" MACH.

 

 

 

 

PEG112C - (4),

PEG150 - (6), PEG187 - (8),

 

 

 

PEG 225 -(10),

PEG262 - (12), PEG300 - (14)

 

 

 

9

HW-016.02

DRAIN LONG

1

 

 

 

10

1570001

VALVE, POP SAFETY 3/4"

1

 

 

 

11

1150001

COUPLING 3/4"

1

 

 

 

12

PF-005.10

PIPE FIT NPL 3/4"X 6"

1

 

 

 

FIGURE 23

PAGE 23

Image 25
Contents PEG-C Table of Contents Read ALL Instructions Before Installing Safety SymbolsInstallation Procedure Ventilation & Combustion AIR Page Connecting Supply and Return Piping Page Vent Installation Vent System Modification Installation Vent Damper Installation InstructionsInstructions Electrical Wiring Connecting GAS ServiceSee Addendum a for Wiring Diagrams and Component Coding For Your Safety Read Before Operating Thermostat InstallationLighting Instructions Operating Instructions for Intermittent Pilot Systems To Turn OFF GAS to Appliance Lighting Instructions for Continuous Pilot SystemNormal Sequence of Operation Connecting Supply Return PIPING, Water Chilled Medium Discharge will be Boiling HOT Water and Steam General InstructionsWill be Boiling HOT Water Water will be Boiling HOT To Clean the Boiler FluewaysSkimming OFF Impurities Water will be Boiling HOT Using Cleaning CompoundBlowing Down Boiler Page 24VOLT Spark PEG-C Replacement Parts PilotManifold PEG300C PEG-C Replacement Parts BaseSide Panel Right ALL PEG-C Replacement Parts JacketsWash 5/16 Flat STL ZP PEG-C Replacement Parts Heat ExchangerPEG-C Replacement Parts Front Panel Controls PEG-C Replacement Parts Electrical Natural GAS Steam Boilers RATINGS, DATA, and Dimensions