MAINTENANCE
SERVICE SCHEDULE
MAINTENANCE | DAILY | WEEKLY | QUARTERLY |
Check machine for cord damage | * |
|
|
Check recovery dome and gasket for |
|
|
|
damage and cleanliness | * |
|
|
Check hoses for wear, blockages, or |
|
|
|
damage | * |
|
|
Check handles, switches, and knobs |
|
|
|
for damage | * |
|
|
Check vac motor intake filter and clean | * |
|
|
Run one gallon of water through |
|
|
|
system | * |
|
|
Clean out recovery tank and check |
|
|
|
float valve to make sure it moves freely | * |
|
|
Clean out solution tank and remove |
|
|
|
and clean vacuum intake screen | * |
|
|
Clean outside of all tanks and check for |
|
|
|
damage | * |
|
|
Run vac motor for at least one minute |
|
|
|
to allow motor to dry | * |
|
|
Store with dome off tank to allow the |
|
|
|
tank to dry | * |
|
|
Check all gaskets for wear and leakage |
| * |
|
Check vacuum intake screen for |
|
|
|
damage; replace if necessary |
| * |
|
Check pump pressure; observe spray |
|
|
|
pattern and check with gauge if |
|
|
|
necessary |
| * |
|
Check and clean solution screen |
| * |
|
Check cables for fraying |
| * |
|
Check overall performance of machine |
| * |
|
Check vac motor carbon brushes |
|
| * |
7 |