Windsor D250(115V) 10070100 manual Maintenance, D-250 PUMP MAINTENANCE

Page 10

MAINTENANCE

D-250 PUMP MAINTENANCE

Per manufacturer’s recommendations the following maintenance should be performed utilizing noted kits:

1.) 500 hours-Kit 86201080 – PRV NO. 250-75A replaces the V-packing, wave washer, packing spreader and plunger guide.

2.) 500 hours-Kit 86201100 – PRV NO. 250-75C replaces the CAM bearing and insert.

3.) 1000 hours-kit 86201090 – PRV NO. 250-75B valve assembly and o-rings.

NOTE: Maintenance and repairs must be done by qualified personnel. Using non-Windsor parts to repair this machine will void the warranty. Contact an authorized Windsor dealer for complete details.

9

D-250 86038570 05/11/07

Image 10
Contents Operating Instructions ENG MODEL D250 115V Beginning with Serial NoCARPET EXTRACTOR Read these instructions before operating the machineTABLE OF CONTENTS INSPECTIONREAD ALL INSTRUCTIONS BEFORE USING THIS MACHINE SAFETY INSTRUCTIONSIMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONSELECTRICAL GROUNDING INSTRUCTIONSGROUNDING INSTRUCTIONS OPERATIONS OPERATION PERIODIC MAINTENANCE MAINTENANCEDAILY MAINTENANCE MONTHLY MAINTENANCEDAILY SERVICE SCHEDULEMAINTENANCE WEEKLYVacuum Motor Carbon Brushes Replacement Ametek Vacuum Motor Carbon Brushes Replacement WindsorWARNING The green D-250 PUMP MAINTENANCE PROBLEM TROUBLESHOOTINGTROUBLE SHOOTING CHART SOLUTIONTECHNICAL SPECIFICATIONS TECHNICAL SPECIFICATIONSD-250 86038570 05/11/07 RECOVERY TANK ASSEMBLY RECOVERY TANK ASSEMBLY CONTROL PANEL GROUP CONTROL PANEL GROUP VACUUM GROUP LOWER VACUUM GROUP LOWER PUMP & HEATER GROUP 200 PSI PUMP & HEATER GROUP 200 PSI SOLUTION TANK ASSEMBLY SOLUTION TANK ASSEMBLY SPARE PARTS SUGGESTED SPARE PARTS 86038570 115V WIRING DIAGRAMD-250 05/11/07