#1 Single | Long stem |
graduated end | |
hinge (Hinge tube) | track roller |
Double graduated
Short stem track rollerend hinge (Hinge
Bottom tube) section
8 | Bottom Section | |
Tools: Level, Wooden shims (if necessary) | ||
|
Center the bottom section in the door opening. Level the section using wooden shims (if necessary) under the bottom section.
Weather seal |
Flag angle
Vertical | 5/16” x |
track | |
assembly | Lag screws |
Jamb |
|
bracket |
|
Bottom | Track |
section | rollers |
12R FA 15R FA 12R QI 15R QI
Flag angle lag screw locations | ||
3/8” to 5/8” |
| |
Spacing |
| |
Bottom section |
| |
Vertical track | Track roller | |
Floor | ||
|
| Level | |
| Bottom section | |
| Wooden shims | |
| (If necessary) | |
9 | Vertical Tracks | |
Tools: Power Drill, 3/16” Drill bit, 7/16” Socket driver, Tape measure, | ||
Level, Step ladder | ||
|
10 | Stacking Sections | |
Tools: Power drill,7/16” Socket driver | ||
|
Note: Refer to door section identification, located in the
Note: The sections can be identified by the graduation of the factory installed graduated end hinges. The smallest graduated end hinge on section should be stacked on top of the bottom section, with each graduated end hinge increasing as the sections are stacked, see Parts Breakdown on page 2.
Note: Make sure end and center hinges are flipped down, when stacking another section on top.
Place track rollers into graduated end hinges of remaining sections.
Note: Larger doors will use long stem track rollers with double graduated end hinges.
With assistance, lift second section and guide the track rollers into the vertical tracks. Lower section until it is seated against bottom section. Flip hinges up. Fasten center hinge(s) first; then end hinges last using
IMPORTANT: If your door is to be installed prior to a finishing construction | NOTE: To prevent center hinge leaf(s) from rotating, first secure the top middle hole of the | |
center hinge leaf with one 1/4” – 14 x 5/8” | ||
of the building’s floor, the vertical tracks and the door bottom section | ||
holes. | ||
assembly should be installed such that when the floor is constructed, no | ||
Repeat same process for other sections, except top section. | ||
door or track parts are trapped in the floor construction. | ||
Important: The tops of the vertical tracks must be level from side to side. | Important: Push & hold the hinge leafs securely against the sections while | |
If the bottom section was shimmed to level it, the vertical track on the | securing with | |
shimmed side must be raised the height of the shim. | between the hinge leafs and the sections. | |
Position the left hand vertical track assembly over the track rollers of the bottom section. | Note: Install lock at this time (sold separately). See optional installation step, Side Lock. | |
Make sure the counterbalance lift cable is located between the track rollers and the door |
| |
jamb. Drill 3/16” pilot holes into the door jamb for the lag screws. |
| |
Loosely fasten jamb brackets and flag angle to the jamb using 5/16” x |
| |
Tighten lag screws, securing the bottom jamb bracket to jamb, maintain 3/8” to 5/8” spac- |
| |
ing, as shown between the bottom section and vertical track. Hang cable drum assembly over |
| |
flag angle. Repeat same process for other side. |
| |
| Lock section |
Left double graduated | Vertical |
end hinge with long | |
stem track roller | tracks |
Right double graduated | |
end hinge with long | |
stem track roller | Secure top |
| |
| middle |
| hole first |
Left graduated end hinge | Center | Right graduated end hinge | |
hinge(s) | |||
with short stem track roller | with short stem track roller |
8
Please Do Not Return This Product To The Store. Contact your local
refer to your local yellow pages business listings or go to the Find a Dealer section online at