Bryan Boilers AH-FS151250D service manual Clearances, Uncrating the Boiler Feed System

Page 5

B O I L E R F E E D S Y S T E M

D A T E : 4 / 3 / 0 3 R E P : 2 / 1 / 9 9

1Section

Installation Instructions –

Boiler Feed System

Note: Please read the entire instruction manual before attempting installation.

Insurance and local or state regulatory codes may contain additional or more stringent requirements than those contained in this manual. Installation must conform to these codes and any other authority having jurisdiction.

Appropriate sections of the National Electric Code and ASME Code should be consulted and followed.

1.1FOUNDATION

Before uncrating, the location should be prepared. The boiler feed system should set upon a good level concrete floor. If the unit is not level or the floor is not in good condition, a concrete foundation should be built, the dimensions being larger than the outside dimensions of the boiler feed system base.

1.2 CLEARANCES

NOTE

Adhere to all applicable local codes and NEC regarding system feed system installation and clearances.

The unit may need room for service accessibility and clearances for piping and electrical connections. Local codes must be applied to specific installations and the minimum clearances established accordingly. If an electrical panel is supplied, the NEC requires a 36” service entrance in front of the electrical panel.

1.3 UNCRATING THE BOILER FEED SYSTEM

Leave the packaging material used for crating in place until ready for installation. The crating is not designed for outdoor storage; therefore the unit should be stored inside. Uncrate the boiler

1

Image 5
Contents Boiler Feed System Boiler Feed System Boiler Feed System Table of Contents Uncrating the Boiler Feed System ClearancesE N E R a L Boiler Feed System ConnectionsA N U a L M a K E U P W a T E R C O N N E C T I O N O N D E N S a T E R E T U R N C O N N E C T I O NV E R F L O W C O N N E C T I O N Boiler Feed System Accessory EquipmentP U M P C O N N E C T I O N S L E C T R I C a L C O N N E C T I O N ST E a M P R E H E a T E R a S S E M B L Y O P T A K E U P F I L L V a L V EU M P S E a K T E S T O F F E E D S Y S T E M a N D P I P I N G L E a N I N G T H E F E E D S Y S T E MR O T E C T I V E D E V I C E S Limit TestO W W a T E R C O N D I T I O N T M O S P H E R I C T a N K D E S I G NE E D W a T E R C O N T R O L O N T H E B O I L E R O I L E R F E E D P U M POperating Instructions Maintenance ScheduleA M I L I a R I Z a T I O N W I T H M a N U a L S U R N I N G T H E S Y S T E M O NE R a T O R S K I L L S / R E S P O N S I B I L I T I E S Required Precautions During Temporary USESystem Clean OUT Cleaning the Boiler and System NEW SystemsBoil OUT Procedure System Cleaning ProcedureBoiler Water Treatment Idle Boiler Care and LAY-UP Suggested Maintenance ScheduleLAY-UP Considerations PRE-OPERATIONAL Cleaning and LAY-UP