Bryan Boilers AH-FS151250D service manual Boiler Feed System

Page 3

M O D E L I D E N T I F I C A T I O N & D E S I G N A T I O N

Boiler Feed System

A – H - FS – 15 – 12 – 50 – D

A = LINING

BLANK – NO LINING

A – APEXIOR LINING

B – GALVANIZED LINING

H = TANK POSITION

H – HORIZONTAL TANK POSITION

V – VERTICAL TANK POSITION

C - COMPACT

FS = FEED SYSTEM (TS – TRANSFER SYSTEM)

“15” = BOILER RELIEF VALVE SETTING “12” = MAX. BOILER HP

“50” = TANK SIZE (GALLONS)

“D” = NO. OF PUMPS

S – SIMPLEX PUMPS

D – DUPLEX (2) PUMPS

T – TRIPLEX (3) PUMPS

Q – QUADRAPLEX (4) PUMPS

Image 3
Contents Boiler Feed System Boiler Feed System Boiler Feed System Table of Contents Uncrating the Boiler Feed System ClearancesO N D E N S a T E R E T U R N C O N N E C T I O N Boiler Feed System ConnectionsE N E R a L A N U a L M a K E U P W a T E R C O N N E C T I O NL E C T R I C a L C O N N E C T I O N S Boiler Feed System Accessory EquipmentV E R F L O W C O N N E C T I O N P U M P C O N N E C T I O N SA K E U P F I L L V a L V E U M P ST E a M P R E H E a T E R a S S E M B L Y O P T E a K T E S T O F F E E D S Y S T E M a N D P I P I N G L E a N I N G T H E F E E D S Y S T E MR O T E C T I V E D E V I C E S Limit TestO I L E R F E E D P U M P T M O S P H E R I C T a N K D E S I G NO W W a T E R C O N D I T I O N E E D W a T E R C O N T R O L O N T H E B O I L E RU R N I N G T H E S Y S T E M O N Maintenance ScheduleOperating Instructions A M I L I a R I Z a T I O N W I T H M a N U a L SE R a T O R S K I L L S / R E S P O N S I B I L I T I E S Required Precautions During Temporary USESystem Cleaning Procedure Cleaning the Boiler and System NEW SystemsSystem Clean OUT Boil OUT ProcedureBoiler Water Treatment Idle Boiler Care and LAY-UP Suggested Maintenance ScheduleLAY-UP Considerations PRE-OPERATIONAL Cleaning and LAY-UP