Aarrow Fires Tf 70 installation manual Installation Typical Metal Insulated Chimney System

Page 14

INSTALLATION

TYPICAL METAL INSULATED CHIMNEY SYSTEM

TO BE INSTALLED TO THE CHIMNEY MANUFACTURERS INSTRUCTIONS IN COMPLIANCE

WITH BUILDING REGULATIONS AND BS7566 PTS 1-4

PLAN VIEW OF REGISTER PLATE AND

CLEARANCES FOR NON INSULATED FLUES

A is minimum clearance for non-insulated flue =

1.5x D to a non-combustible surface/material

or

3 x D to combustible surface/material

14

Acorn Multifuel Stoves

Image 14
Contents Acorn Copyright Contents Petroleum Coke Introduction Safety Principle of the FireCheck List AFS009ATechnical Data AcornCombustible Materials Installation General PrecautionsHearth AIR for Combustion HandlingRemoval of the Throat Plate Installation Firebox Liner PanelsFitting the Optional Floor Fixing KIT Grate Installation Multifuel GrateGrate BAR Replacement Assembling the GrateInstallation Fitting the Flue Outlet and HOT Plate Flues and ChimneysInstallation For ALL AppliancesInstallation Typical Rear Flue Outlet Installation Typical Metal Insulated Chimney System Fitting Installation Instructions ADD in BoilersWater Connections AIR Inlet Controls Installation InstructionsFinal Check Multi Purpose Operating Tool Operating InstructionsDisassemble Airwash Fire Door GlassRecommended Reading Adjusting the Door HingesFuel Types Burning Wood Lighting the FireExtended Burning Mixed FuelsDE Ashing OVER-FIRINGASH Removal ClinkerChimney Sweeping Annual MaintenanceCleaning Door GlassChecklist Final Check ListParts List Part Description Visual Aid AcornParts List Parts List Customer Registration GuaranteeInvalidate the Appliance Warranty Service Record Date of Visit Company Work Carried Out Signature’ve checked it and it’s O.K Final Factory Check List
Related manuals
Manual 36 pages 2.85 Kb