Aarrow Fires Tf 70 installation manual Stratford Tf & Ti Multifuel Boiler Stoves

Page 1

Operating & Installation Manual

Stratford Tf & Ti

Multifuel Boiler Stoves

 

 

 

 

 

 

 

 

 

Stratford Tf 70 Boiler Stove

 

 

 

(With optional stand)

 

 

 

 

 

 

PLEASE RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE

 

 

 

 

 

 

Arada Ltd

 

Rev 6

The Fireworks

 

Nov 2006

Bridport

Part No:AFS1121

Dorset, DT6 3BE

 

 

Great Britain

 

 

Tel. (44) 01308 427234

 

 

Fax. (44) 01308 427441

 

 

www.aarrowfires.com

 

 

Image 1
Contents Stratford Tf & Ti Multifuel Boiler Stoves Copyright Contents Petroleum Coke Principle of the Fire Introduction SafetyPart Description Stratford Visual Aid Tf 30b Check ListTf 70b Not to scaleStratford Tf 30b Technical Data1kW = 3420 BTU’s 25.4mm = 1 inch Aarrow AIR Wash System Operating Instructions Multifuel GrateAIR Inlet Controls Thermostatic ControlMulti Purpose Operating Tool Operating Instructions Interlock SystemRiddling Door TrimOperating Instructions Door AdjustmentFuel Retainer Bars Lighting the Fire Operating Instructions Fuel TypesRecommended Reading Burning Wood Overnight BurningMixed Fuels AnthraciteAccessories CleaningOVER-FIRING Chimney Sweeping Servicing MaintenanceDoor Glass Outer FinishInstallation General Precautions Grate BAR Replacement Installation Multifuel GrateAssembling the Grate Throat Plate InspectionFlues and Chimneys Installation Fitting the Flue Outlet and HOT PlateFor ALL Appliances InstallationAdjustment Thermostat Installation Integral BoilersSee below if adjustment is required To fit/remove thermostat on Tf modelsFlue Builders Opening / Chimney BreastInstallation Installation Installation Stratford Tf & Ti Multifuel Boiler Stoves Boiler Tapping Positions Boiler Tapping Positions Stratford Ti 40 Inset Boiler Tapping Positions Heating systems Installation Water ConnectionsHOT Water Systems HOT Water SystemsChecklist Tf 30b Tf 50b Tf 70b Part DescriptionParts List Comb Tf 30b Tf 50b Tf 70b Tf 90bCustomer Registration GuaranteeStamp is required Date of Visit Company Work Carried Out Signature Service RecordFinal Factory Check List ’ve checked it and it’s O.K
Related manuals
Manual 28 pages 6.51 Kb