Aarrow Fires Tf 70 installation manual Installation

Page 22

INSTALLATION

PLAN VIEW OF REGISTER PLATE AND CLEARANCES FOR NON INSULATED FLUES

A is minimum clearance for non-insulated flue =

1.5x D to a non-combustible surface/material

or

3 x D to combustible surface/material

22

Stratford Tf & Ti Boiler Multifuel Stoves

Image 22
Contents Stratford Tf & Ti Multifuel Boiler Stoves Copyright Contents Petroleum Coke Introduction Safety Principle of the FireTf 70b Check ListPart Description Stratford Visual Aid Tf 30b Not to scaleStratford Tf 30b Technical Data1kW = 3420 BTU’s 25.4mm = 1 inch AIR Inlet Controls Operating Instructions Multifuel GrateAarrow AIR Wash System Thermostatic ControlRiddling Operating Instructions Interlock SystemMulti Purpose Operating Tool Door TrimOperating Instructions Door AdjustmentFuel Retainer Bars Lighting the Fire Operating Instructions Fuel TypesRecommended Reading Mixed Fuels Overnight BurningBurning Wood AnthraciteAccessories CleaningOVER-FIRING Door Glass Servicing MaintenanceChimney Sweeping Outer FinishInstallation General Precautions Assembling the Grate Installation Multifuel GrateGrate BAR Replacement Throat Plate InspectionInstallation Fitting the Flue Outlet and HOT Plate Flues and ChimneysInstallation For ALL AppliancesSee below if adjustment is required Installation Integral BoilersAdjustment Thermostat To fit/remove thermostat on Tf modelsBuilders Opening / Chimney Breast FlueInstallation Installation Installation Stratford Tf & Ti Multifuel Boiler Stoves Boiler Tapping Positions Boiler Tapping Positions Stratford Ti 40 Inset Boiler Tapping Positions Installation Water Connections Heating systemsHOT Water Systems HOT Water SystemsChecklist Part Description Tf 30b Tf 50b Tf 70bParts List Tf 30b Tf 50b Tf 70b Tf 90b CombCustomer Registration GuaranteeStamp is required Service Record Date of Visit Company Work Carried Out Signature’ve checked it and it’s O.K Final Factory Check List
Related manuals
Manual 28 pages 6.51 Kb