Aarrow Fires Tf 70 installation manual Petroleum Coke

Page 4

WARNING

TO ALL MULTIFUEL USERS

PETROLEUM COKE

SOME OF WHOSE BRAND NAMES ARE

"CALCO", "PETROCOKE" OR "WONDERCO"

MUST NOT BE BURNED IN THIS APPLIANCE

TO USE THESE FUELS WILL INVALIDATE THE

APPLIANCE GUARANTEE

IF IN DOUBT CONTACT THE SOLID FUEL ASSOCIATION

TELEPHONE NUMBER 0800 600 000

www.solidfuel.co.uk

THE USE OF SPARE PARTS OTHER THAN THOSE SUPPLIED

BY ARADA LTD WILL INVALIDATE THE

APPLIANCE GUARANTEE.

4

Stratford Tf & Ti Multifuel Boiler Stoves

Image 4
Contents Stratford Tf & Ti Multifuel Boiler Stoves Copyright Contents Petroleum Coke Introduction Safety Principle of the FireCheck List Part Description Stratford Visual Aid Tf 30bTf 70b Not to scaleStratford Tf 30b Technical Data1kW = 3420 BTU’s 25.4mm = 1 inch Operating Instructions Multifuel Grate Aarrow AIR Wash SystemAIR Inlet Controls Thermostatic ControlOperating Instructions Interlock System Multi Purpose Operating ToolRiddling Door TrimOperating Instructions Door AdjustmentFuel Retainer Bars Lighting the Fire Operating Instructions Fuel TypesRecommended Reading Overnight Burning Burning WoodMixed Fuels AnthraciteAccessories CleaningOVER-FIRING Servicing Maintenance Chimney SweepingDoor Glass Outer FinishInstallation General Precautions Installation Multifuel Grate Grate BAR ReplacementAssembling the Grate Throat Plate InspectionInstallation Fitting the Flue Outlet and HOT Plate Flues and ChimneysInstallation For ALL AppliancesInstallation Integral Boilers Adjustment ThermostatSee below if adjustment is required To fit/remove thermostat on Tf modelsBuilders Opening / Chimney Breast FlueInstallation Installation Installation Stratford Tf & Ti Multifuel Boiler Stoves Boiler Tapping Positions Boiler Tapping Positions Stratford Ti 40 Inset Boiler Tapping Positions Installation Water Connections Heating systemsHOT Water Systems HOT Water SystemsChecklist Part Description Tf 30b Tf 50b Tf 70bParts List Tf 30b Tf 50b Tf 70b Tf 90b CombCustomer Registration GuaranteeStamp is required Service Record Date of Visit Company Work Carried Out Signature’ve checked it and it’s O.K Final Factory Check List
Related manuals
Manual 28 pages 6.51 Kb