Aarrow Fires Tf 70 installation manual Copyright

Page 2

Congratulations on your choice of an Aarrow Stove.

More than 20 years experience has been put into the development of our Stratford Family to ensure ultimate performance and years of trouble free enjoyment.

Every detail on the fire has been carefully engineered and designed which is why we are so confident in the reliability of our product.

Should you have any questions about our Stratford Stoves that are not covered in this manual, please contact the Aarrow dealer in your area, or call our Technical support department on

01308 427234

© COPYRIGHT 2003

Arada Ltd

This booklet has copyright & may not be copied in whole or part used for any purpose other than that for which it is supplied without express written consent from Arada Ltd.

Image 2
Contents Stratford Tf & Ti Multifuel Boiler Stoves Copyright Contents Petroleum Coke Introduction Safety Principle of the FireTf 70b Check ListPart Description Stratford Visual Aid Tf 30b Not to scale1kW = 3420 BTU’s 25.4mm = 1 inch Technical DataStratford Tf 30b AIR Inlet Controls Operating Instructions Multifuel GrateAarrow AIR Wash System Thermostatic ControlRiddling Operating Instructions Interlock SystemMulti Purpose Operating Tool Door TrimFuel Retainer Bars Door AdjustmentOperating Instructions Recommended Reading Operating Instructions Fuel TypesLighting the Fire Mixed Fuels Overnight BurningBurning Wood AnthraciteOVER-FIRING CleaningAccessories Door Glass Servicing MaintenanceChimney Sweeping Outer FinishInstallation General Precautions Assembling the Grate Installation Multifuel GrateGrate BAR Replacement Throat Plate InspectionInstallation Fitting the Flue Outlet and HOT Plate Flues and ChimneysInstallation For ALL AppliancesSee below if adjustment is required Installation Integral BoilersAdjustment Thermostat To fit/remove thermostat on Tf modelsBuilders Opening / Chimney Breast FlueInstallation Installation Installation Stratford Tf & Ti Multifuel Boiler Stoves Boiler Tapping Positions Boiler Tapping Positions Stratford Ti 40 Inset Boiler Tapping Positions Installation Water Connections Heating systemsHOT Water Systems HOT Water SystemsChecklist Part Description Tf 30b Tf 50b Tf 70bParts List Tf 30b Tf 50b Tf 70b Tf 90b CombStamp is required GuaranteeCustomer Registration Service Record Date of Visit Company Work Carried Out Signature’ve checked it and it’s O.K Final Factory Check List
Related manuals
Manual 28 pages 6.51 Kb