Desa VP5D installation manual Connecting to GAS Supply, External Regulator With Vent

Page 9

OWNER’S MANUAL

INSTALLATION

Continued

CONNECTING TO GAS SUPPLY

WARNING: This appliance re- quires a 3/8" NPT (National Pipe Thread) inlet connection to the pressure regulator.

WARNING: A qualified service person must connect heater to gas supply. Follow all local codes.

CAUTION:Neverconnectheater directly to the propane/LP supply. This heater requires an external regulator (not supplied). Install the external regulator between the heater and propane/LP supply.

CAUTION: Use only new, black iron or steel pipe. Inter- nally-tinned copper tubing may be used in certain areas. Check your local codes. Use pipe 3/8" diameter or greater to allow proper gas volume to heater. If pipe is too small, undue loss of pressure will occur.

Installation must include a equipment shutoff valve, ground joint union, and plugged 1/8" NPT tap. Locate NPT tap within reach for test gauge hook up. NPT tap must be up- stream from heater (see Figure 13). An appliance main gas valve (equipment shutoff valve) shall be provided in an accessible location for turning on or shutting off the gas to the appliance.

IMPORTANT: Install an equipment shutoff valve in an accessible location. The equip- ment shutoff valve is for turning on or shutting off the gas to the appliance.

Apply pipe joint sealant lightly to male threads. This will prevent excess sealant from going into pipe. Excess sealant in pipe could result in clogged heater valves.

CAUTION: Use pipe joint seal- ant that is resistant to liquid pe- troleum (LP) gas.

Install sediment trap in supply line as shown in Figure 13. Locate sediment trap where it is within reach for cleaning. Locate sedi- ment trap where trapped matter is not likely to freeze. A sediment trap traps moisture and contaminants. This keeps them from going into heater controls. If sediment trap is not installed or is installed wrong, heater may not run properly.

IMPORTANT: Hold pressure regulator with wrench when connecting it to gas pip- ing and/or fittings.

The installer must supply an external regu- lator. The external regulator will reduce incoming gas pressure. You must reduce incoming gas pressure to between 11 and 14 inches of water. If you do not reduce incom- ing gas pressure, heater regulator damage could occur. Install external regulator with the vent pointing down as shown in Figure

12.Pointing the vent down protects it from freezing rain or sleet.

Propane/LP

External

Supply Tank

Regulator

Vent

Pointing

Down

Figure 12 - External Regulator With Vent

3/8" NPT Pipe Nipple

Equipment

Shutoff

Valve *

From External Regulator (11" W.C. to 14" W.C. Pressure)

3" Minimum

Figure 13 - Gas Connection

Pressure

Regulator

Heater

Cabinet

Ground Joint

Union

Tee Joint

 

 

 

 

Reducer

 

Test

Bushing to

 

 

Gauge

1/8" NPT

 

 

Connection *

1/8" NPT

 

 

 

Plug Tap

 

 

 

 

 

 

Tee

 

 

 

Joint

 

Sediment

Pipe

 

 

Trap

Nipple

 

 

 

Cap

 

 

 

Pointing Down

*A CSA/AGA design-certified equipment shutoff valve with 1/8" NPT tap is an acceptable alternative to test gauge connection. Purchase the optional CSA/AGA design-certified equipment shutoff valve from your dealer. See Accessory, page 18.

Continued

104273

9

Image 9
Contents What to do if YOU Smell GAS OWNER’S Operation and Installation ManualPROPANE/LP GAS Heaters Safety InformationProduct Identification Product FeaturesLocal Codes UnpackingProviding Adequate Ventilation AIR for Combustion and VentilationUnusually Tight Construction Confined and Unconfined SpaceAIR for Combustion Ventilation Determining FRESH-AIR Flow for Heater LocationDetermining if You Have a Confined or Unconfined Space Ventilation AIR Ventilation Air From Inside BuildingVentilation Air From Outdoors Installation Items InstallationInstalling Heater to Wall Locating HeaterInstalling Bottom Mounting Screw Installing Two Mounting ScrewsPlacing Heater On Mounting Screws Removing Front Panel Of HeaterExternal Regulator With Vent Connecting to GAS SupplyPressure Testing Gas Supply Piping System For Your Safety Read Before LightingPressure Testing Heater Gas Connections Operating HeaterLighting Instructions Manual Lighting ProcedureTo Select Heating Level To Turn OFF GAS To ApplianceInspecting Burner Cleaning and MaintenanceObserved Problem Possible Cause Remedy TroubleshootingVice person Gas leak. See Warning statement at Parts List Illustrated Parts BreakdownVP5D ODS/PILOT VP10A ODS/PILOT Replacement Parts SpecificationsService Hints Service Publications Technical104273 Warranty Information