The free inset method of installation may be used instead of infilling. Details are available on request.
THERMOSTAT
Before lighting the fire check the cold setting distance of the thermostat.
With the control knob at the minimum setting the flap should be just closed as shown in Fig. 8. To adjust the distance slacken the locking nut and adjust as necessary. When set correctly
ASSEMBLY
Fit the side panels and hood onto the appliance. Instructions for this are enclosed with the panel pack.
Replace any internal parts previously removed.
PRE LIGHTING
CHECK
Before initial lighting check the following points:
1.The bottom grate bars must all be fitted and should move freely and easily when the riddling mechanism is operated.
2.The plates round the sides and back of the grate must be in position and sitting correctly.
3.The throat plate must be fitted in the roof of the appliance.
COMMISSIONING
On completion of the installation and after allowing a suitable period of time for the fire cement and mortar to dry out, the fire should be lit and checked to ensure that smoke and fumes are taken from the appliance up the chimney and emitted safely. Also check all joints and seals.
On completion of the installation and commissioning please leave the operating instructions with the customer and advise on the use of the appliance.
Page 10
Flap Just Closed With
Knob Set To Minimum
Locking Nut
Thermostat Flap
Fig. 8. Thermostat Setting
HV 7/96