Charnwood DX20i MkII Thermostat, Assembly, PRE Lighting Check, Commissioning

Page 10

The free inset method of installation may be used instead of infilling. Details are available on request.

THERMOSTAT

Before lighting the fire check the cold setting distance of the thermostat.

With the control knob at the minimum setting the flap should be just closed as shown in Fig. 8. To adjust the distance slacken the locking nut and adjust as necessary. When set correctly re-tighten the locking nut. Ensure that the flap opens and closes freely as the knob is turned.

ASSEMBLY

Fit the side panels and hood onto the appliance. Instructions for this are enclosed with the panel pack.

Replace any internal parts previously removed.

PRE LIGHTING

CHECK

Before initial lighting check the following points:

1.The bottom grate bars must all be fitted and should move freely and easily when the riddling mechanism is operated.

2.The plates round the sides and back of the grate must be in position and sitting correctly.

3.The throat plate must be fitted in the roof of the appliance.

COMMISSIONING

On completion of the installation and after allowing a suitable period of time for the fire cement and mortar to dry out, the fire should be lit and checked to ensure that smoke and fumes are taken from the appliance up the chimney and emitted safely. Also check all joints and seals.

On completion of the installation and commissioning please leave the operating instructions with the customer and advise on the use of the appliance.

Page 10

Flap Just Closed With

Knob Set To Minimum

Locking Nut

Thermostat Flap

Fig. 8. Thermostat Setting

HV 7/96

Image 10
Contents Charnwood Fuels Operating Instructions forGeneral Points Door OperationControlling Fire Multifuel GrateLighting Running the Fire with the Doors OpenOvernight Burning ASH ClearanceRefuelling RiddlingCleaning Maintenance Throat Plate and Flueway CleaningSpecial Points When Burning Coal Trouble ShootingFume Emission Fire Blazing Out ControlOver-Firing Door Glass Blacks Up Performance Health and Safety Precautions Instructions ChimneyHOT Water System Preparation FireplaceFitting the Fire Fitting Optional ADD-IN BoilerTypical Hot Water System Using Indirect Hot Water Cylinder Flue Connection InfillingPRE Lighting Check AssemblyThermostat CommissioningCharnwood DX20i MkII Overall Dimensions