MODEL EHU-701, SINGLE AND THREE PHASE

Figure 35-1

1) Remove 24 metal clips by pushing gently on top of

each clip with a screwdriver while cupping the clip withBarrier the other hand.

2) Clean the inside of the steam generator thoroughly

Barrier Retainer

unsing a scraper, stiff bristle brush and/or water spray

 

and rinse with clear water.

 

3)High voltage units are supplied with a barrier/drain screen assembly in the lower tank half to increase tank life.

 

Inspect the barrier/drain screen assembly and replace if

Drain Screen

 

necessary.

 

4)

Place a flat washer and O-ring on each ¼" electrode

 

 

stud and push the studs through the holes in the upper

Figure 35-2

 

tank half (Figure 35-2).

 

 

 

Hex Nut

5)

The mounting hole on each electrode is attached to the

Washer

 

 

tank top with a slotted self-tapping screw.

'O' Ring

6)

From the outside, install a flat washer and ¼" hex nut on

Washer

 

each electrode stud. Tighten these with a 7/16" wrench

 

 

 

so they are just snug (Figure 35-2).

 

FILL AND DRAIN SYSTEM REPAIR

General:

In the event of a "drain system failure" (C05) or a "fill system failure" (C06) indication on the three digit numerical display, perform the following steps to identify and correct the fault.

Drain System Failure:

Check for drain valve operation. With the unit on; press the tank on/off button, turning off the tank con- tactor (tank off light illuminated). Press the manual drain button. The drain light should go on and you should hear the drain valve operate with a sharp click. Repeatedly activate the manual drain button to determine if the valve is operating.

1)If the drain valve does not operate but the drain light is on, check for 24 VAC between the two leads on the drain valve (Figure 28-1, 28-2). After checking, TURN THE POWER OFF.

a)If 24 VAC was NOT found, check wiring continuity to the circuit board. Repair broken wires as necessary. If wires are intact, call the factory for assistance.

b)If 24 VAC WAS found, measure the coil resistance of the drain valve with the leads disconnected. The coil resistance should be 10 ohms; if it is not, replace the drain valve.

2)If the drain valves can be heard to operate but no water drains out, TURN THE POWER OFF, then:

a)Check for a plugged drain valve and/or plugged drain adaptor. It is often possible to see an accumulation of solids in the inlet to the drain valve or in the neck of the steam generator. If this is the case, remove the generator and clean out the drain valve and tank drain adaptor. See tank removal section on Page 33.

34

Image 34
Contents Installation and Maintenance Metal Tools Away from These Areas Table of Contents Check Local Codes PRE-INSTALLATIONCheck Shipment Site SelectionWater Total Mounting the Humidifier InstallationElectrical Service Wiring Important Please observe the followingWater Fill Supply Connect DrainPressure in duct is high, see Figure Control Wiring Control Humidistat10 Ft Wall Mounted Control HumidistatDuct Mounted Control Humidistat Airflow SwitchHigh Limit Duct Humidistat Audible Alarm Generator aInstrument Panel Before Turning on the Power START-UP Procedure for Armstrong Series EHU-700 HumidifiersTurn on Power AT the Circuit Breaker Page Page Troubleshooting Guide Tank Contactor Operation Operational GuidelinesMonitoring Stat Demand Monitoring Current Monitoring % PowerManual Drain Mode Automatic Drain OperationC02 Tank Needs Cleaning EHU-700 DiagnosticsDiagnostic Display Messages C00 Normal Operation C01 High WaterC06 Fill System Failure C04 High Limit CircuitC05 Drain System Failure C07 Overcurrent FailureC09 I/O Diagnostics Water Quality and Treatment for EHU Series Humidifiers When Water Conductivity is TOO LOWGeneral Remedy When Water Conductivity is TOO HighResults RemediesSteam Generator Parts Valves and Mechanical Parts Electrical Parts EHU-700 Parts List Steam Generator Maintenance MaintenanceRecommended Maintenance Schedule To 2 Days After Start UP Month to 1 YearTank Removal and Replacement ALL Models Steam Generator Chemical Cleaning Procedure Page Tank DISASSEMBLY, CLEANING, and Electrode Replacement Models EHU-703 and 704, Single and Three PhaseFill and Drain System Repair Model EHU-701, Single and Three PhaseDrain System Failure Fill System Failure Humidistat Data Autocal ProcedureSpecifications Sensor Failure ProtectionDimensions Sensor CharacteristicsHumidity SET Point Reset by Outside Temperature AIR Supply High Limit Humidity SensorApplication Example Humidistat model number H270-69-13-10-31Dimensional Information

EHU-701, EHU-700 Series, EHU-704, EHU-703 specifications

Armstrong World Industries has long been a leader in the ceiling and wall solutions industry, and its EHU-700 Series exemplifies the commitment to innovation and quality. The EHU-700 Series, which includes models such as the EHU-703, EHU-704, and EHU-701, is designed for a variety of commercial applications, combining aesthetic appeal with superior performance characteristics.

One of the key features of the EHU-700 Series is its exceptional acoustic control. The panels are crafted using advanced sound-absorbing materials that effectively reduce noise levels in busy environments. This makes them ideal for areas such as offices, schools, and healthcare facilities, where quietness can significantly enhance productivity and comfort. The EHU-700 Series has been rigorously tested and certified to meet stringent industry standards, ensuring its effectiveness in noise reduction.

Additionally, these ceiling panels are designed with durability in mind. Made from high-quality components, the EHU-700 Series is resistant to moisture and staining, making them suitable for spaces exposed to humidity, such as kitchens and restrooms. This resilience ensures that the panels maintain their aesthetic appeal over time, reducing maintenance costs for facility managers.

The EHU-700 Series also incorporates Armstrong's innovative technologies to enhance ease of installation and flexibility. The panels feature a lightweight design, allowing for straightforward handling and installation. Compatibility with various grid systems ensures that the EHU-700 Series can be easily integrated into existing architectural designs, providing a seamless finish.

Another significant aspect of the EHU-700 Series is its commitment to sustainability. Armstrong World Industries emphasizes eco-friendly manufacturing processes and materials, allowing architects and builders to achieve green building certifications, such as LEED. The use of recyclable materials in the panel composition reflects a commitment to reducing the environmental footprint.

In summary, the EHU-700 Series, including the EHU-703, EHU-704, and EHU-701 models, showcases Armstrong World Industries' dedication to quality and innovation. With unparalleled acoustic performance, durability, installation convenience, and sustainability, these ceiling panels are ideal for a wide array of commercial environments, proving to be a valuable investment for modern architectural needs. Their combination of functionality and design ensures that they meet the demands of today's dynamic spaces.