The Schedule setup screen allows you to review and set the setback schedule for the thermostat. The thermostat has a 4 by 7 schedule. Four times a day can be selected for heating and cooling setpoints. Each day of the week can have a different schedule. Groups of days can be copied with the same schedule. When the thermostat is set to run mode, the schedule will be executed daily, with the setpoints being changed as per that day’s schedule stored in the thermostat. Hold mode stops the scheduled operation and holds the current setpoints until changed manually or by network commands.

The Schedule setup screen (Figure 5) gives you the option of setting a custom setback schedule or the option to load one of two preset schedules.

Figure 5. Schedule setup screen

Select Schedule

 

Heat and Cool

Up

Preset: Comfort

 

Preset: EnergyMiser

 

 

Down

Done

Select

Done

Select

Screen options include:

Heat and cool. Change the individual day/hour and setpoints for the heating and cooling schedule (see Heat and cool schedule screen on page 10).

Preset: Comfort. Load the comfort schedule into the thermostat. This is a preset schedule with mild setbacks.

Preset: EnergyMiser. Load the EnergyMiser schedule into the thermostat. This is a preset schedule with deeper setbacks.

Screen navigation buttons include:

Done. Return to Main menu screen on page 7. Select. Select the schedule to view or modify. Up. Move selection pointer up.

Down. Move selection pointer down.

Image 13
Contents SmartCommand Thermostat Installation ManualPage Contents Contacting technical support Preface Safety terms and symbolsConventions used in this document Wall display unit WDU Product overviewWDU control buttons WDU screens WDU LEDsThermostat control screen Temperature displaySetpoint display Clock displayUp and down buttons Mode buttonMenu button Fan buttonLED 2 green, system Economy mode display Communication error displayRun/Hold button LED displayDone. Return to Thermostat control screen on Main menu screenMessages Messages screenSchedule setup screen Schedule setup screenHeat and cool schedule screen Heat and cool schedule screenBack. Return to the Heat and cool schedule screen on Copy schedule screenUser settings screen User settings screenSet clock screen Set clock screenSensor calibration screen Sensor calibration screenBacklight display screen Backlight display screenThermostat information screen Thermostat information screenInstaller settings screen Installer settings screenNetwork settings submenu Page Wiring overview Installation overviewFreeze protection Freeze protectionWiring Wall display unit installationMounting Remote sensor connectionControl unit to WDU wiring Control unit installationControl unit to Hvac wiring Retrofit wiringStandard Hvac system wiring Hvac system wiringHvac system 24 VAC transformer DIP switchesW2/O CO Heat pump Hvac system wiringDIP switches Common or split transformer systems Control unit connectionRS485 com port Serial communicationRS485 address RS485 protocol Thermostat network commandsThermostat bench test System checklistSerial communication test Under the Settings tab, go Ascii setupHvac system wiring example Hvac system testingHeat pump system quick test Standard Hvac system quick testHvac system transformer Control unit wiringDIP switch SW1 settings Network commands Serial network command and variable listNetwork variables Name Variable data Default valueOnline publication library Contacting technical supportSmartCommand Thermostat Installation Manual

CC-SCSTAT specifications

The GE CC-SCSTAT is a cutting-edge control system designed for power generation and distribution applications. This advanced platform is engineered to enhance efficiency, reliability, and safety in industrial environments, making it a preferred choice among operators in various sectors, including oil and gas, manufacturing, and utilities.

One of the main features of the GE CC-SCSTAT is its robust data acquisition and control capabilities. It integrates a comprehensive suite of sensors and monitoring tools that allow for real-time tracking of system performance. This functionality is crucial for identifying anomalies and optimizing operational parameters, ultimately leading to reduced downtime and increased productivity.

The system utilizes advanced communication protocols, such as Ethernet and Modbus, facilitating seamless integration with existing infrastructure. This interoperability ensures that organizations can implement the CC-SCSTAT without the need for extensive system overhauls, thus minimizing capital expenditure and disruption to ongoing operations.

In terms of technology, the GE CC-SCSTAT employs state-of-the-art algorithms for predictive maintenance and performance analytics. These capabilities are powered by machine learning and artificial intelligence, enabling the system to learn from historical data and predict potential failures before they occur. This proactive approach to maintenance not only extends the lifespan of equipment but also contributes to significant cost savings over time.

Another noteworthy characteristic of the CC-SCSTAT is its user-friendly interface, which provides operators with easy access to vital system information. The intuitive dashboard displays key performance indicators (KPIs), alarms, and alerts in a clear and organized manner, allowing for quick decision-making and response. Additionally, the system supports mobile access, enabling operators to monitor and control processes from remote locations.

Safety is a fundamental aspect of the GE CC-SCSTAT design. The system incorporates multiple layers of security features, including redundancy and failover mechanisms, ensuring continuous operation even in the event of a component failure. Furthermore, compliance with industry standards and regulations guarantees that the system adheres to best practices in safety and reliability.

In conclusion, the GE CC-SCSTAT stands out as a robust control system with advanced features and technologies. Its integration capabilities, predictive analytics, user-centric design, and unwavering focus on safety position it as a leading solution in the power generation and industrial control sectors. As organizations increasingly look to enhance operational efficiency and sustainability, the CC-SCSTAT proves to be a valuable asset in achieving these objectives.