Emerson Process Management 1F95-1291 Programmable Fan Option, Energy Saving Factory Pre-Program

Page 13

Cooling Example:

1.In cool, press Auto Schedule once.

2.Press or to select a comfortable cooling tempera- ture (example 75°).

3.Press Auto Schedule again. Your thermostat is now pro- grammed for 75° for all cooling time periods.

Your cooling program for each day of the week will look like this:

6:30 75°

8:00 75°

5:00 75°

10:30 75°

PROGRAMMING

Programmable Fan Option

In the Set Schedule mode, the Fan key is used to select the fan operation during a program period. The default state of the Fan key is FAN Auto (fan runs during a call for cool but not on a call for heat). It can be changed to FAN Prog (fan runs during a program period). Each press of the FAN key will change the mode of the fan between Auto and Prog.

In the Run mode, when a program period that has FAN Prog begins, the fan will turn on and stay on during the complete period. The display will show FAN On Prog. Pressing the FAN key will change FAN On Prog to On (fan running continuous- ly) or Auto. To return to FAN On Prog, press Run Schedule.

Energy Saving Factory Pre-Program

The 1F95-1291 thermostats are programmed with the energy saving settings shown in the table below for all days of the week. If this program suits your needs, simply set the thermostat clock and press the RUN key.

The table below shows the factory set heating and cooling schedule for all days of the week.

 

* Wake Up

Leave For Work

* Return Home

Go To Bed

 

(Morning)

(Day)

 

(Evening)

(Night)

 

 

 

 

 

 

 

 

 

 

Heating Program

6:00 AM

70°F

8:00 AM

 

62°F

5:00 PM

70°F

10:00 PM

62°F

 

 

 

 

 

 

 

 

 

 

Cooling Program

6:00 AM

75°F

8:00 AM

 

83°F

5:00 PM

75°F

10:00 PM

78°F

 

 

 

 

 

 

 

 

 

 

*You can eliminate these two program periods in the configuration menu (reference #5) if the building is occupied all day. Day period will change to 6:00 AM and 70° and can be programmed as required.

Planning Your Program – Important

The Heating and Cooling Program schedules below allow you to pencil in your own program times and temperatures.

The 1F95-1291 comes configured for 7 day programming and can also be configured for 5+1+1 programming (see configura- tion section).

Factory settings are listed on Monday, Saturday and Sunday. If you are re-programming a 5+1+1 day schedule, pencil in your own times and temperatures directly below the factory times and temperatures.

If you are re-programming a 7 day schedule, fill in all lines with the times and temperatures you want. Keep the following guidelines in mind when planning your program.

In Heating, lower temperatures will save energy.

In Cooling, higher temperatures will save energy.

If you plan on using Auto Changeover, do not program the heating temperature higher than the cooling temperature.

13

Image 13
Contents Single Stage, Multi-Stage, Heat Pump Save these instructions for future useModel Programming Choices 1F95-1291 1F95-1291 Humidity Control Touchscreen ThermostatInstalling New Thermostat InstallationBattery Location Power Stealing SwitchesSingle Stage and Multi-Stage Connections Wiring DiagramsHeat Pump Connections 24 VAC 24 VAC 120 VACDisplays and Keypad Lockout when in keypad lockout mode Programming and Configuration ItemsThermostat Quick Reference Home Screen DescriptionKey INSTALLER/CONFIGURATION MenuHeat Cool Heat Pump Emer Heat Mode Med SlowINSTALLER/CONFIGURATION Menu Select Remote Sensor as Indoor or Outdoor If Record the number you select for future useCheck Thermostat Operation Operating Your ThermostatFan Operation Heating/HumidifierChoose the Fan Setting Auto or On Emergency ModeChoose the System Setting Cool, Off, Heat, Em, Auto Manual Operation for Non-Programmable ModeProgramming Energy Saving Factory Pre-Program Programmable Fan OptionPlanning Your Program Important Worksheet for Re-Programming 5+1+1 and 7 Day Program Wired Remote Temperature SensingHeating Wake Up Leave For Work Return Home Go To Bed Morning Fan Day Evening NightAveraging or Weighting Remote Sensors TroubleshootingDual Fuel Temperature Setpoint Blower Balance Point for HeatingCommon problems Reset Operation Symptom Possible Cause Corrective Action

1F95-1291 specifications

Emerson Process Management has established itself as a leader in providing innovative automation solutions to various industries. One of its notable offerings is the 1F95-1291, a highly advanced and reliable component specially designed for process control systems. This device is essential for optimizing operational efficiency and enhancing the performance of various industrial applications.

One of the main features of the 1F95-1291 is its robust design, which ensures reliability even in harsh industrial environments. The device is carefully constructed to withstand high levels of vibration, temperature fluctuations, and other challenging conditions. This durability reduces downtime and maintenance costs, allowing operators to focus on productivity.

Technologically, the 1F95-1291 integrates seamlessly with Emerson's extensive suite of control systems, providing compatibility and ease of integration. Its advanced communication capabilities allow it to interface with various field devices, enhancing the overall functionality of the automation system. The device supports various industrial communication protocols, ensuring versatile connectivity options that meet the diverse needs of modern industries.

The 1F95-1291 also features sophisticated algorithms that enable real-time data processing and analysis. This capability empowers operators to make informed decisions based on accurate and timely information. The built-in diagnostics function continuously monitors the system's health, providing alerts and insights that help in preemptive maintenance planning.

A standout characteristic of the 1F95-1291 is its user-friendly interface, designed to simplify operation and reduce training time. The intuitive display allows users to access critical information quickly, facilitating efficient management of operations. Additionally, firmware updates are easily manageable, ensuring that users can take advantage of the latest advancements without significant downtime.

In summary, Emerson Process Management's 1F95-1291 is a cutting-edge solution that exemplifies the company's commitment to innovation, reliability, and user-centric design. With its robust construction, advanced technologies, and user-friendly features, the 1F95-1291 is an essential asset for any organization seeking to enhance its process control capabilities and drive operational excellence. The device's adaptability to various industrial environments further underscores its value, making it a preferred choice among professionals in the field.