Installation of Brackets, Frames and Grilles in New Construction
Installation of
Brackets, Frames
and Grilles in New
Construction
Stage One: Before Drywall is Hung Insulating the Wall Cavity.
If feasible, fill the wall cavity with insula- tion at this point.
Attach the wings to the bracket by snap- ping them into the sides of the bracket. The wings can be shortened by breaking them along the scored lines if their length will interfere with a corner or eaves. You can mount the bracket horizontally or ver- tically (See Figure 8).
Figure 8
Screw one side of the assembled bracket with wings to the stud using one of the supplied screws. Level the bracket. Screw the other side of the bracket to the stud. Two screws on each side makes for a very secure installation. Attach the wire to the bracket at the indicated wire tie points
(See Figure 9).
Stage Two: Before Paint
Screw the frame to the installed bracket using the supplied screws. Do not over- tighten the screws. This will distort the frame and the grille will not fit (this is not permanent, just loosen the screws and the grille will pop in) (See Figure 10).
Painting the Aluminum Grilles
The grille is important to the sound of the BG loudspeakers. Do not fill the holes of the grille with paint. The grille is construct-
13