State Industries GS675YRVIT, GS675HRVIT instruction manual Step B, Step E, Step F, Step G

Page 22

B.Deburring

Use a knife, plastic pipe deburring tool, or file to remove burrs from the end of small diameter pipe. Be sure to remove all burrs from around the inside as well as the outside of the pipe. A slight chamfer (bevel) of about 10°-15° should be added to the end to permit easier insertion of the pipe into the end of the fitting. Failure to chamfer the edge of the pipe may remove cement from the fitting socket, causing the joint to leak.

STEP B

C.Test dry fit of the joint

Tapered fitting sockets are designed so that an interfaced fit should occur when the pipe is inserted about 1/3 to 2/3 of the way into the socket. Occasionally, when pipe fitting dimensions are at the tolerance extremes, it will be possible to fully insert dry pipe to the bottom of the fitting socket. When this happens, a sufficient quantity of cement must be applied to the joint to fill the gap between the pipe and fitting. The gap must be filled to obtain a strong, leak-free joint.

D.Inspection, cleaning, priming

Visually inspect the inside of the pipe and fitting sockets and remove all dirt, grease or moisture with a clean dry rag. If wiping fails to clean the surfaces, a chemical cleaner must be used. Check for possible damage such as splits or cracks and replace if necessary.

Depth-of-entry

Marking the depth of entry is a way to check if the pipe has reached the bottom of the fitting socket in Step F. Measure the fitting depth and mark this distance on the pipe O.D. You may want to add several inches to the distance and make a second mark as the primer and cement will most likely destroy your first one.

Apply primer to the surface of the pipe and fitting socket with a natural bristle brush. This process softens and prepares the PVC or CPVC for the solvent cementing step. Move quickly and without hesitation to the cementing procedure while the surfaces are still wet with primer.

E.Application of solvent cement

Apply the solvent cement evenly and quickly around the outside of the pipe at a width a little greater than the depth of the fitting socket.

Apply a light coat of cement evenly around the inside of the fitting socket. Avoid puddling.

Apply a second coat of cement to the pipe end.

STEP E

F. Joint assembly

Working quickly, insert the pipe into the fitting socket bottom and give the pipe or fitting a 1/4 turn to evenly distribute the cement. Do not continue to rotate the pipe after it has hit the bottom of the fitting socket. A good joint will have sufficient cement to make a bead all the way around the outside of the fitting hub. The fitting will have a tendency to slide back while the cement is still wet so hold the joint together for about 15 seconds.

STEP F

G. Cleanup and joint movement

Remove all excess cement from around the pipe and fitting with a dry cotton rag. This must be done while the cement is still soft.

The joint should not be disturbed immediately after the cementing procedure, and sufficient time should be allowed for proper curing of the joint. Exact drying time is difficult to predict because it depends on variables such as temperature, humidity and cement integrity. For more specific information, you should contact your solvent cement manufacturer.

STEP G

22

Image 22
Contents Printed Whenever maintenance adjustment or service is required197218-003 Safe INSTALLATION, USE and Service Important DefinitionsGeneral Safety General Safety Table of Contents IntroductionBELOW. Keep Clear of ALL Obstructions Typical Installation Replacement Parts and Deliming ProductsMixing Valve Usage Locating the NEW Water Heater Facts to Consider About the LocationInsulation Blankets ALL AIR from Inside Buildings See ALL AIR from Outdoors See Figures 7, 8, 8BWater Piping Installing the NEW Water HeaterChemical Vapor Corrosion Closed Water SystemsValve and Pipe Insulation if supplied Temperature-Pressure Relief ValveValve Discharge Pipe Requirements GAS Piping with Flexible Connector Gas PipingFilling the Water Heater Sediment Traps Drip LegsVenting Vent Pipe Termination Planning the Vent System Horizontal Vent ClearancesVent Hoods MAY be Extremely HOT During Operation Blower Assembly Installation CondensateInstallation of Vent System Vent Terminal INSTALLATION, SidewallPower Vent Wiring Schematic Installation of Vent SYSTEM, Sidewall Installation of Vertical Vent SystemVent Pipe Preparation Recommended BRUSH* Size for Primer Cement ApplicationsStep F Step BStep E Step GWhat to do if YOU Smell GAS Power Before ServicingDo not try to light the burner by hand Do not TRY to Light the Burner by HandTemperature Regulation Water TemperatureStart UP Conditions For Your InformationOperational Conditions Venting System Inspection Periodic MaintenanceBurner Cleaning Burner Operation and InspectionDraining Temperature-Pressure Relief Valve OperationAnode ROD Inspection Anode ROD Depletion DetailService Leakage CheckpointsRepair Parts List Propane Burner Assembly Natural GAS BurnerTrouble Shooting Troubleshooting GuidelinesLED Status Problem Solution LED Status Problem Solution Troubleshooting Guidelines Page Page Conditions and Exceptions Important InformationTennessee Waltz Parkway Ashland City, TN

GS675HRVIT, GS675YRVIT specifications

The State Industries GS675HRVIT and GS675YRVIT are high-efficiency water heaters designed to meet the growing demand for reliable and energy-efficient hot water solutions. These models are ideal for both residential and light commercial applications, offering a blend of advanced technology, durable construction, and user-friendly features.

One of the standout characteristics of the GS675HRVIT and GS675YRVIT is their compact design, which makes them easy to install in various spaces without compromising performance. Both units are equipped with a high-efficiency gas burner that provides rapid water heating capabilities. Their power input allows for quick recovery rates, ensuring a steady supply of hot water when needed.

Energy efficiency is a key feature of these models. They utilize advanced insulation materials and designs that minimize heat loss, thus significantly reducing energy consumption. This not only contributes to lower utility bills but also supports environmental sustainability efforts by lowering carbon footprints. Both models are designed to meet or exceed Energy Star certification standards, highlighting their commitment to energy conservation.

In terms of technology, the GS675HRVIT and GS675YRVIT incorporate robust safety features, including a temperature and pressure relief valve that prevents dangerous pressure build-up, as well as an electronic ignition system that improves reliability by eliminating the need for a standing pilot light. Additionally, the gas control valve ensures precise regulation of the water temperature, enhancing safety and comfort for users.

Durability is another hallmark of these water heaters. Constructed with high-quality materials, the units feature a glass-lined tank that resists corrosion, extending the lifecycle of the product. They also come with a comprehensive warranty, providing peace of mind for consumers regarding their investment.

Users will appreciate the convenience that the GS675HRVIT and GS675YRVIT models offer, including easy-to-use controls and clear indicators for operational status. Installation and maintenance are simplified, making it straightforward for both homeowners and professionals to manage the unit over time.

Overall, State Industries GS675HRVIT and GS675YRVIT are excellent choices for anyone looking for efficient, reliable, and durable water heating solutions. With their innovative technology, energy-saving features, and user-friendly design, these models stand out in the competitive market of hot water heaters.