Desa SL30NT/SL30PT Installing ROD and Screen, Pressure Testing Heater Gas Connections

Page 10

10

INSTALLATION

Checking Gas Connections (Cont.) Installing Rod and Screen

INSTALLATION

Continued

Pressure Testing Heater Gas Connections

1.Open equipment shutoff valve (see Figure 9, page 9).

2.Open main gas valve located on or near gas meter for natural gas or open propane.LP supply tank valve.

3.Make sure control knob of heater is in the OFF position.

4.Check all joints from equipment shutoff valve to control valve (see Figure 10 or 11). Apply noncorrosive leak detection fluid to gas joints. Bubbles forming show a leak.

5.Correct all leaks at once.

6.Light heater (see Operating Heater, page 11). Check all other internal joints for leaks.

7.Turn off heater (see To Turn Off Gas to Appliance, page 11).

INSTALLING ROD AND SCREEN

1.Insert rod through small rings located at top of screen (see Figure 12).

2.From back of stove, insert rod into hole located inside right front of stove as shown in Figure 13.

3.Slip left side of rod down into slot on inside left front of stove (see Figure 13).

Rod

Rings

Equipment

 

 

Shutoff Valve

 

 

Propane/LP

 

 

Supply Tank

 

 

 

Figure 12 - Assembling Rod and Screen

 

 

Rod with Screen

 

 

Assembled

Control Valve Location

Slot on Inside Left

Hole on Inside Right

 

 

Front of Stove

Figure 10 - Checking Gas Joints on Propane/LP Gas Unit

Front of Stove

 

Equipment

 

 

Shutoff Valve

 

 

Gas Meter

 

 

 

Figure 13 - Installing Screen Into Stove (View From Back of

 

Stove)

 

Control Valve Location

 

 

Figure 11 - Checking Gas Joints on Natural Gas Unit

 

 

For..com

111487-01B

Image 10
Contents Csbnt Csbpt Cspbnt Cspbpt Cspint Cspipt What to do if YOU Smell GASTable of Contents Safety InformationProduct Identification Typical Stove Cabinet Model with Comfort Glow Gas Log HeaterLocal Codes Product FeaturesAIR for Combustion and Ventilation Ventilation AIR Determining FRESH-AIR Flow for Heater LocationDetermining if You Have a Confined or Unconfined Space Ventilation Air From Inside BuildingVentilation Air From Outdoors InstallationUnpacking Stove TOP Clearances to Combustibles Vent-Free Operation Only Check GAS Type Minimum Wall and Ceiling Clearances see Figure Connecting to GAS Supply Installation Items NeededPressure Testing Gas Supply Piping System Checking GAS ConnectionsInstalling ROD and Screen Pressure Testing Heater Gas ConnectionsOperating Heater Installing LOG SETFor Your Safety Read Before Lighting Lighting InstructionsThermostat Control Operation Manual Lighting ProcedureInspecting Burners To Turn OFF GAS To ApplianceMain Burner Cleaning MaintenanceCleaning Burner Injector Holder and Pilot AIR Inlet Hole LogsTroubleshooting Observed Problem Possible CauseObserved Problem Possible Cause Remedy Maintenance,Top Technical Service SpecificationsService Hints AccessoriesIllustrated Parts Breakdown Models SL30PT and SL30NTParts List KEY Part Number SL30PT SL30NT Description QTYStove Body Models CSB SERIES, Cspb Series Cspi Series KEY Part Number Description QTY Parts Centrals FBDOwners Registration Form Postage Required 111487-01B Warranty Information