Installation
Please read and understand these instructions before installing pedestal or ash pan and leg option.
Failure to follow these instructions carefully could cause personal injury or property damage.All screws are pre installed on the base of the unit.
PEDESTAL INSTALLATION:
• Remove the bricks from the unit before starting.
• Loosen the two (2) carriage bolts that secure the unit to the pallet. Slide the pallet towards the front to release carriage bolts from the key holed slots in the unit. Place the unit on the pallet on its back.
• Slide the pedestal assembly over the bolts located on the base of the unit using the key holed slots provided.
• Tighten all four (4) bolts ensuring the pedestal is properly aligned to the edges of the unit.
• Ensure that the gasket material is properly sealed before continuing.
• Stand the unit on the pedestal and set the unit in the location ready for installation.
•If fresh air supply is being supplied from the bottom of the unit please install the cover plate supplied to the rear of the pedestal covering the 4 inch (10 cm) hole.
LEGS AND ASH PAN INSTALLATION:
• Remove the bricks from the unit before starting.
• Loosen the two (2) carriage bolts that secure the unit to the pallet. Slide the pallet towards the front to release carriage bolts from the key holed slots in the unit. Place the unit on the pallet on its back.
• Slide the ash pan assembly over the bolts using the key holed slots provided and tighten all four
(4) bolts.
• Ensure that the gasket material is properly sealed before cleaning.
• Carefully remove the cast iron legs from the packaging and secure each leg with two (2) bolts provided.
• Secure all four (4) legs, push the leg towards the center of the stove and align the legs with the outer edges of the firebox.
•Stand the unit on the legs and set the unit in the location ready for installation
10