A.O. Smith
750 SERIES, GB/GW-300, 500, 650
warranty
FCB Drawing #211759
Troubleshooting
Warranty
UIM Operating Procedures
FCB Eight position Dipswitch
Page 6
Figure 1B. FCB (Drawing #211759)
6
Page 5
Page 7
Image 6
Page 5
Page 7
Contents
Series 400, 401, 402, 403, 404
14-18
Lighting Instructions for the GB/W 300 through 750 models
Lighting Instructions
Risk of Scalds
Burner System
Inputs To CCB and FCB
CCB Drawing #211758
FCB Drawing #211759
PDB Drawing #211760
Outputs from CCB and FCBs
CCB/FCB Indicator Lamps & Fuses
Line Polarity Indicator & Fuse Protection
Igniters
FCB Eight position Dipswitch
GB/LB
Temperature Setpoints System Control Algorithm
UIM Operating Procedures
Stages 1 and 2 will turn on in sequence from 1 to
Description of CCB control states
Description of FCB control states
Idle State
Operating Setpoint
Operating Differential Setpoint
Connection Diagram Drawing #211769
Page
UIM Touch Switches
Fault Displayed Description Red LED Lockout
Hard
Soft
See below
Other troubleshooting hints
Page
Page
Page
NEW Boiler Limited Warranty
Top
Page
Image
Contents