B.Deburring

Use a knife, plastic pipe deburring tool, or file to remove burrs from the end of small diameter pipe. Be sure to remove all burrs from around the inside as well as the outside of the pipe. Aslight chamfer (bevel) of about 10°-15° should be added to the end to permit easier insertion of the pipe into the end of the fitting. Failure to chamfer the edge of the pipe may remove cement from the fitting socket, causing the joint to leak.

STEP B

C.Test dry fit of the joint

Tapered fitting sockets are designed so that an interfaced fit should occur when the pipe is inserted about 1/3 to 2/3 of the way into the socket. Occasionally, when pipe fitting dimensions are at the tolerance extremes, it will be possible to fully insert dry pipe to the bottom of the fitting socket. When this happens, a sufficient quantity of cement must be applied to the joint to fill the gap between the pipe and fitting. The gap must be filled to obtain a strong, leak-free joint.

D.Inspection, cleaning, priming

Visually inspect the inside of the pipe and fitting sockets and remove all dirt, grease or moisture with a clean dry rag. If wiping fails to clean the surfaces, a chemical cleaner must be used. Check for possible damage such as splits or cracks and replace if necessary.

Depth-of-entry

Marking the depth of entry is a way to check if the pipe has reached the bottom of the fitting socket in Step F. Measure the fitting depth and mark this distance on the pipe O.D. You may want to add several inches to the distance and make a second mark as the primer and cement will most likely destroy your first one.

Apply primer to the surface of the pipe and fitting socket with a natural bristle brush. This process softens and prepares the PVC or CPVC for the solvent cementing step. Move quickly and without hesitation to the cementing procedure while the surfaces are still wet with primer.

E.Application of solvent cement

Apply the solvent cement evenly and quickly around the outside of the pipe at a width a little greater than the depth of the fitting socket.

Apply a light coat of cement evenly around the inside of the fitting socket. Avoid puddling.

Apply a second coat of cement to the pipe end.

STEP E

F. Joint assembly

Working quickly, insert the pipe into the fitting socket bottom and give the pipe or fitting a 1/4 turn to evenly distribute the cement. Do not continue to rotate the pipe after it has hit the bottom of the fitting socket. A good joint will have sufficient cement to make a bead all the way around the outside of the fitting hub. The fitting will have a tendency to slide back while the cement is still wet so hold the joint together for about 15 seconds.

STEP F

G. Cleanup and joint movement

Remove all excess cement from around the pipe and fitting with a dry cotton rag. This must be done while the cement is still soft.

The joint should not be disturbed immediately after the cementing procedure, and sufficient time should be allowed for proper curing of the joint. Exact drying time is difficult to predict because it depends on variables such as temperature, humidity and cement integrity. For more specific information, you should contact your solvent cement manufacturer.

STEP G

24

Image 24
Contents Power Vented GAS Models W/HOT Surface Ignition Residential GAS Water HeatersSafe INSTALLATION, USE and Service Important DefinitionsGeneral Safety General Safety Table of Contents IntroductionTypical Installation Replacement Parts and Deliming ProductsRelief Valve Elbow Access Door Condensate Hose and Drain PAN Mixing Valve Usage Locating the NEW Water Heater Facts to Consider about the LocationInsulation Blankets ALL AIR from Inside Buildings See ALL AIR from Outdoors See Figures 7, 8Installing the NEW Water Heater Water PipingTEMPERATURE-PRESSURE Relief Valve Valve and Pipe Insulation if suppliedGAS Piping with Flexible Connector GAS PipingVent Pipe Assembly Sediment TrapsFilling the Water Heater VentingHorizontal Vent Clearances Canadian Horizontal Vent Clearances Vent Pipe TerminationVent Hoods MAY be Extremely HOT During Operation Planning the Vent System CondensateBlower Assembly Installation Installation of Vent SystemVent Terminal INSTALLATION, Sidewall Power Vent Wiring Schematic Figure Vent Termination FigureInstallation of Vent SYSTEM, Sidewall Installation of Vertical Vent SystemVent Attenuation Assembly Installation Vertical VAA Installations RecommendedInch vent Vertical VAA Installations Inch vent Horizontal VAA InstallationsVent Pipe Preparation Recommended BRUSH* Size for Primer Cement ApplicationsStep B Step EStep F Step GPower Before Servicing Burner. Do not try to light the burner by handWhat to do if YOU Smell GAS Do not TRY to Light the Burner by HandTemperature Regulation Temperature Indicators Temperature Adjustment ButtonsDisplay D E FFor Your Information Start UP ConditionsOperational Conditions Periodic Maintenance Burner CleaningVenting System Inspection Burner Operation and InspectionTEMPERATURE-PRESSURE Relief Valve Operation Anode ROD InspectionDraining Service Leakage CheckpointsRepair Parts List Troubleshooting Guidelines Trouble ShootingBurner flame, ensure flame is steady see #8 below Troubleshooting Guidelines Service and Labor Responsibility Claim ProcedureConditions and Exceptions Limitation on Implied Warranties

ARGSS02708 specifications

The A.O. Smith ARGSS02708 is a standout product in the realm of water heating solutions, designed with a focus on efficiency, durability, and user convenience. This particular model exemplifies the cutting-edge technology that A.O. Smith is known for, making it a preferred choice for both residential and commercial applications.

One of the main features of the ARGSS02708 is its high efficiency. The unit employs advanced insulation techniques, which minimize heat loss and ensure that energy is utilized effectively. With an Energy Factor that meets or exceeds industry standards, this water heater can significantly reduce energy bills, making it an environmentally friendly choice that doesn't compromise on performance.

Another notable characteristic of the A.O. Smith ARGSS02708 is its robust construction. Built with high-quality materials, this water heater is designed to withstand the wear and tear of daily use. The units are manufactured with a coating that helps resist corrosion, which not only prolongs the lifespan of the heater but also ensures that it operates safely and reliably over time.

The ARGSS02708 also incorporates smart technology that enhances user experience. It features an intelligent electronic control panel that allows for easy monitoring and adjusting of temperature settings, ensuring optimal comfort. This user-friendly interface provides real-time feedback, making it straightforward for users to manage their hot water needs efficiently.

Moreover, the model supports faster recovery rates compared to traditional water heaters. With its powerful heating elements, the ARGSS02708 can provide a steady supply of hot water at consistent temperatures, catering to households or businesses with high hot water demands.

Safety is another critical aspect that A.O. Smith prioritizes in the design of the ARGSS02708. The unit is equipped with multiple safety features, including thermal cut-off switches and pressure relief valves, which ensure safe operation under varying conditions.

In summary, the A.O. Smith ARGSS02708 emerges as an excellent option for those seeking a reliable, efficient, and user-friendly water heating solution. Its combination of advanced technology, durable construction, high efficiency, and safety features make it a commendable investment for anyone looking to enhance their water heating experience.