Harbor Freight Tools 95592, 95593, 95591 Unpacking, Assembly and Operating Instructions

Page 8

UNPACKING

When unpacking, check to make sure all the parts shown on the Parts List on page 12 are included. If any parts are missing or broken, please call Harbor Freight Tools at the number shown on the cover of this manual as soon as possible.

ASSEMBLY AND OPERATING INSTRUCTIONS

Note: For additional information regarding the parts listed in the following pages, refer to the Assembly Diagram on page 13.

WARNING! Always make sure to turn off the electricity powering the

Pump’s electrical outlet and that the Pump is unplugged from its outlet prior to assembling the unit, unclogging the unit, or making any adjustments to the unit.

1.If necessary, have a certified electrician install (within 10 feet of where the Pump will be located) a 115 volt, GFCI electrical outlet that is dedicated only to the Pump.

Any outlet should be well above the water line.

2.The discharge has both internal and external NPT threads. Use either 1-1/4” NPT Male or 1-1/2” NPT Female PVC pipe for the discharge line. Do not use a pipe smaller than 1-1/4”.

REV 08b

SKU 95591/95592/95593

For technical questions, please call 1-800-444-3353

PAGE 8

Image 8 Contents
For technical questions or replacement parts, please call Distributed exclusively by Harbor Freight ToolsSpecifications General Safety RulesSave this Manual ModelWork Area Electrical SafetyPersonal Safety Specific Safety Rules ServiceDo not pump hazardous materials Prong Plug and Outlet OutletPlug and Outlet Outlets for 2-Prong PlugSee Table a 25’ 50’ 75’Any outlet should be well above the water line Assembly and Operating InstructionsUnpacking Figure E See Figure EINSPECTION, MAINTENANCE, and Cleaning Do not use damaged equipmentDiagram Problem Possible SolutionPart Description Qty Parts ListPlease Read the Following Carefully Diagram Limited 1 year / 90 Day warranty