Ace Hardware R-30-T7 installation manual Deep Well Pump Installation 4 Diameter Cased Well, Step

Page 6

DEEP WELL PUMP INSTALLATION (4" DIAMETER CASED WELL)

For wells over 25, but not exceeding 60 feet in depth, the twin ejector must be installed down inside the well rather than attached to the front of the pump. Materials with part numbers are quality Water Ace parts.

General Materials

One Jet Tank System #R-30-T7. Includes: 1/3 HP jet pump mounted on a 7-gallon diaphragm pressure tank, pressure gauge, and twin ejector with gasket, bolts, venturi tubes, and foot valve.

One can PVC cement (read instructions carefully)

One can thread compound (read instructions carefully)

One 1-1/4" close nipple

One 1" x 4" nipple

One 1-1/4" x 5" nipple

Two 1" female PVC adapters

One 1" male PVC adapter

Two 1-1/4" male PVC adapters

Enough rigid 1-1/4" PVC pipe and couplings to reach from bottom of well to pump (delivery pipe)

Enough rigid 1" PVC pipe and couplings to reach from bottom of well to pump (pressure pipe))

One well seal #RWS4-1012

One 1-1/4" PVC elbow

One 1" PVC elbow

REMINDER: ALL JOINTS AND CONNECTIONS MUST BE AIRTIGHT. A SINGLE PIN- HOLE LEAK WILL PREVENT THE PROPER OPERATION OF THE PUMP. USE THREAD COMPOUND ON ALL THREADED CONNECTIONS UNLESS SPECIFIED OTHERWISE.

STEP Thread 1-1/4" close nipple

 

 

 

 

1

into foot valve. Thread the

 

 

EJECTOR

 

 

 

 

other end of 1-1/4" close

 

 

 

 

 

 

 

 

nipple into bottom of twin

1-1/4"

 

ejector. Hand tighten, then

 

 

 

CLOSE

 

 

 

 

tighten 1/4 turn with pipe

 

 

NIPPLE

 

 

 

 

 

 

wrench.

 

 

 

FOOT

 

 

 

 

VALVE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

STEP The ejector has two holes in

 

 

 

 

 

 

1" X 5"

2

the top of it. Thread venturi

 

 

NIPPLE

 

 

 

 

tube (part #25881A281

 

 

 

 

 

stamped on the side) into

 

 

 

 

larger hole until snug. Thread 1" x

 

 

VENTURI

5" nipple into smaller hole. Only

 

 

 

TUBE

 

 

 

 

hand tighten venturi tube. Tighten

 

 

 

 

nipple 1/4 turn with pipe wrench.

 

 

 

 

 

 

 

 

EJECTOR

 

 

 

 

 

 

STEP Lower the assembly into 5 the well, foot valve first.

Use a pipe clamp to prevent assembly for sliding down into well. Cement as many couplings and sections of rigid PVC pipe on both sides of ejector as it takes to equal the depth of your well minus five feet, then firmly clamp assembly with a pipe clamp to prevent it from sliding down into the well.

STEP

3

Thread a 1-1/4" male PVC adapter over the venturi tube and into ejector. Thread a 1" female PVC adapter onto 1" x 5" nipple. Tighten adapters 1/4 turn with crescent wrench.

1" FEMALE

 

PVC

1-1/4" MALE

ADAPTER

PVC

 

ADAPTER

STEP Remove pipe clamp and 6 slide well seal #RWS4-1012

12" OF

PVC PIPE

STEP Subtract five feet from the 4 depth of your well. This is

the total length of PVC pipe and couplings to cement

onto both the 1-1/4" male and 1" female PVC adapters. Cement a section of PVC pipe to each adapter.

23833A343

1"1-1/4"

PVCPVC

PIPEPIPE

over PVC pipes and onto well casing. DO NOT let

assembly slide down into well. Posi- tion assembly so that twelve inches of PVC pipes protrude from well seal. Using crescent wrench, turn bolts on well seal counterclockwise until rubber gaskets are tight against the well casing and the PVC pipes.

6

PROTRUD- ING FROM WELL SEAL

WELL SEAL #RWS4-1212

Image 6
Contents JET Tank System 23833A343Important Instructions Before Installation Shallow Well Pump CapacitiesDeep Well Pump Capacities Important Select Correct Voltage Piping Shallow Well Pump Installation 4 Diameter Cased WellTools Needed for all pump installations Draining for Servicing or for WinterThan 24 lbs. for the R520. If no pressure shows Deep Well Pump Installation 4 Diameter Cased Well StepComplete Deep Well Installation Limited Warranty Problem Possible CausesReplacement Parts JET Tank System13, 19 Revision to Parts List Retain these instructions for future reference