STEP Cut 1" pipe 2" shorter than | ||
7 | the | ELBOW |
| ||
rough edges. Cement 1" | 1" PVC | |
and | ELBOW | |
|
| |
| pipes protruding from the |
|
| well seal. | 1" PIPE 2" |
|
| |
|
| SHORTER |
|
| THAN |
|
| PIPE |
|
|
|
STEP Thread | 1 1/4" MALE | |
8 | adapter into top hole in front | PVC |
of | ADAPTER | |
| ||
Thread 1" x 4" nipple into | 1" x 4" | |
| ||
| bottom hole in front of pump. | NIPPLE |
|
|
STEP Thread the 1" female PVC | 1 1/4" | |
adapter onto the 1" x 4" | ||
FEMALE | ||
9 nipple. | PVC | |
ADAPTER |
STEP
10
1 1/4" PVC PIPE
Cement as many sec- tions and
couplings of rigid 1" and
STEP Place a large bucket
11 beneath the pressure regulator outlet. Start motor. Turn regulator
adjustment screw down tight. If pump is properly primed a
high pressure will immediately
show on the pressure gauge. With pump operating at high pressure, slowly unscrew reg- ulator adjustment screw until
maximum water flow is obtain-
ed without pressure dropping to zero. If pressure falls completely, retighten adjustment screw and
Steady pressure must not be less than 24 lbs. for the
R520 and 32 lbs. for the R100. If no pressure shows: Stop motor, remove pressure gauge plug from pressure regulator, add more water, and try again. Complete installation should look like the drawing to the right.
COMPLETE
DEEP WELL
INSTALLATION
CAUTION: If you change pressure switch settings, set the