GE PMCS 6.15 quick start Test Case

Page 22

EnerVista PMCS 6.15 Quick Start Guide

and creates a Modbus request(s) for the required registers. If all the registers required can fit into one Modbus return message (124 registers in sequential order) than only one request for one block of data is made. With only one request needed the GE device update time will be roughly 250ms.

However if the amount of registers are too many for one return message or the registers needed are more than 125 registers apart than the server breaks the request into two or more Modbus requests requiring two or more blocks of data. Devices with small register maps, such as an MVT trip unit , generally need only one Modbus request with a device response time of about 500 Milliseconds (the MVT has a longer device response time than most devices thus it takes 500ms to process and return a request). . But larger devices (MLPQM, UR, ML750, etc.) may require 4, 5, 6 or more Modbus requests with a device response time that could be as much as three seconds. To poll the entire register map of a UR can take over 6 seconds requiring over 24 modbus requests. The device update cycle time is, to a high degree, independent of the physical network. A single device on a 19.2K baud serial line will have roughly the same update time as a single device on Ethernet.

The Enervista Modbus Master supports each network independent of other networks. So what happens on network A does not affect what happens on network B. A network is defined as a specific serial line or IP (and its IPport) address. If network A has only 1 device on it and only one register block is needed than data updates will be 250ms. But if network B has 4 devices on it requiring a single block from each than the ‘round robin’ time will be 1000ms.

Enervista PMCS, Integrator and PMCS also support polling of the devices Alarm/Event Registers and the Oscillography registers. These registers are constantly polled along with any other device registers. If a new device alarm/event or waveform is detected in the device (this condition is monitored via dedicated registers) the Enervista software then initiates an auto download of the required data. These data is interleaved with the real time data request so the impact on performance is minimized. New alarm/events can be downloaded very quickly but waveforms can take up to 10 minutes to download (it depends on the device and waveform settings).

Test Case:

Generic data retrieval:

Configuration:

Network

Device 1

Device 2

Multinet 1.1.1.1

MLPQM

MLPQM

UR 1.1.1.2

F60

 

Multinet 1.1.1.3

ML750

 

*ML750 1.1.1.4

ML750

 

*ML750 with built in Modbus TCP/IP

Device 3 ML750

22

Image 22
Contents GE Multilin TM Table Of Contents System Requirements IntroductionMinimum system requirements Recommended system requirements IEDs Supported SummaryGE IEDs Versions Basic steps to configure a systemSupported Firmware Versions ProductIntroduction to EnerVista Pmcs Toolkit GroupToolkit group Device Setup Introduction to Device SetupAdding a Device To add a new device, perform the following stepsSerial Site Only parameters Other features of Configurator are Returning to the Main MenuAlarms and Events EventsWhat’s on the EventViewer Screen? Toolkit group Waveforms Waveform AvailabilityIntroduction to Comtrade Viewing waveforms of Comtrade FormatFAQ EnerVista Pmcs 6.15 Quick Start Guide Viewing waveforms of CSV Format EnerVista System Tray Tool Understanding Enervista Pmcs Architecture HardwareEnerVista Pmcs 6.15 Quick Start Guide Modbus TCP/IP vs. Modbus RTU Device update times using Multilin Enervista softwareGEMultinet or Modbus TCP/IP/RTU bridge Test Case FAQ Testing Conclusion

PMCS 6.15 specifications

GE PMCS 6.15, or General Electric's Power Management Control System version 6.15, represents a significant advancement in the management and control of electrical power systems. This software solution is tailored for utility companies, industrial plants, and commercial facilities, allowing them to optimize their energy usage, improve reliability, and enhance their overall operational efficiency.

One of the main features of GE PMCS 6.15 is its integrated system for monitoring and managing power quality. This includes real-time data acquisition and trend analysis, enabling users to keep a close watch on voltage levels, frequency, harmonic distortion, and other key power quality metrics. This capability helps organizations to reduce downtime and minimize the risks of equipment failure due to power quality issues.

Another critical technology incorporated in PMCS 6.15 is advanced predictive analytics. By utilizing machine learning algorithms, the system can detect anomalies in power usage patterns, forecast potential outages, and suggest preventive measures. This proactive approach significantly enhances system reliability and allows for better planning and response strategies.

In terms of user experience, PMCS 6.15 features an intuitive interface that simplifies navigation and enhances operational efficiency. Its customizable dashboards provide at-a-glance insights into system performance, allowing operators to quickly identify issues and implement corrective actions. Additionally, the system supports mobile accessibility, enabling users to monitor and control power management functions remotely from smartphones or tablets.

The platform is also designed for scalability and integration with existing infrastructure. Whether an organization is upgrading from an earlier version or implementing power management solutions for the first time, PMCS 6.15 can be tailored to fit specific needs. Its compatibility with third-party applications and equipment ensures that users can leverage additional technologies without undergoing a complete overhaul of their systems.

Moreover, security is a paramount concern in today's interconnected world, and PMCS 6.15 addresses this with robust cybersecurity measures. The system employs encryption, multi-factor authentication, and other security protocols to safeguard sensitive data and protect against unauthorized access.

In summary, GE PMCS 6.15 stands out in the realm of power management solutions, offering advanced features such as real-time monitoring, predictive analytics, user-friendly interfaces, scalable integration, and enhanced security protocols. These characteristics make it an invaluable tool for optimizing electricity management, enhancing equipment reliability, and driving operational excellence in various sectors. As energy demands continue to evolve, leveraging solutions like GE PMCS 6.15 will be essential in achieving sustainable and efficient power management.