3M FSTMO75 manual Tank Pressure Check, Replacement Parts

Page 7

RO Membrane Cartridge (Replace every 24-36 months) continued

4)Pull down on RO cartridge.

5)Discard used RO cartridge.

6)Remove red cap from new RO cartridge and moisten the o-ring with water.

7)Insert new RO cartridgeinto the filter head. Be sure that the ears on the cartridge line up with the spaces in the head.

8)Turn new cartridge 1/4 turn to the right.

9)Open tank shut-off and inlet valves (see Figure 2)

10)Divert the Water Sample Valve outlet to drain.Open valve and let water run through the RO system to drain for 10 minutes.

11)Close valve. NOTE: Please allow the water tank to fill (approximately 60 minutes) before using steamer.

Tank Pressure Check

CAUTION

To reduce the risk associated with property damage due to water leakage:

• Tank Pressure should be checked yearly.

Tools Required:

Piece of 1/4” tubing or Bucket

Bicycle or tire pressure gauge

Bicycle tire pump

1)Empty the storage tank.

a.Shut off the inlet water valve and Water Booster System if applicable.

b.Make sure tank shut-off valve located at the top of the water tank is open.

c.Attach a piece of tubing from the water sample valve to drain OR use a bucket to catch water from the water sample valve.

d.Open the water sample valve and drain the tank until empty. Leave water sample valve open.

2)Unscrew the blue cap on the side of the tank to expose the Schrader Air Valve.

3)Read the tank's air pressure using a standard bicycle or automobile tire pressure gauge that is capable of reading pressure accurately from 0-10 psi (0 - 68.9 kPa).

4)The air pressure should be between 8 -10psi (55.2 - 68.9 kPa).

5)If the air pressure is below 8 psi (55.2 kPa) or above 10 psi (68.9 kPa) complete the following steps.

a.Using a standard bicycle pump add or release air pressure in the tank.

b.Repeat Steps 4-5 until the pressure is 8-10 psi (55.2 - 68.9 kPa).

c.Make sure the blue cap is put back onto the air pressure port.

6)Close the water sample valve.

7)Open the tank shut-off valve. Turn on the inlet water valve and booster pump if they were turned off.

8)Allow 60 minutes for tank to fill before operating the steamer.

Replacement Parts

Part Number

Description

54-3030

Stainless Steel bracket complete with filter heads and RO shut-off valve

56-161351

Tank

60-23298

Tank shut-off valve

30-6049

Tank banding clamp

55706-08

Pre-filter cartridge-Must be replaced every twelve months or at the specified service cycle.

55987-15

RO module-Must be replaced every 24-36 months or at the specified service cycle.

60-232270

Inlet water valve

82-11302

3/8" blue tubing -1 ft (30.5 m)

82-11205

1/4" red tubing - 10 ft (3.05 m)

52-318203

2 3/4” Stealth flow control tube assembly

68512-03

Water Sample Valve Assembly (Includes 3/8” Reducing Tee, tubing and 1/4”Shut-off Valve)

74-3560404

1/4” x 1/4” Stem x Barb Adapter

74-3560604

3/8” x 1/4” Stem x Barb Adapter

7

Image 7
Contents 3M Water Filtration Products To reduce the risk associated with back strain DamageTo reduce the risk associated with choking To reduce the risk of physical injuryProduct Dimensions Parts ListMounting Plumbing Connections System Start-Up Using Push-In FittingsRO Membrane Cartridge Replace every 24-36 months Tank Pressure Check Replacement PartsProblem Cause Solution Troubleshooting GuidePage Page Page Cuno Incorporated

FSTMO75 specifications

The 3M FSTMO75 is a versatile and innovative product that stands out in the realm of transportation safety and visibility solutions. Designed primarily for use in various applications including transportation, construction, and emergency response, the FSTMO75 offers exceptional performance and reliability.

One of the main features of the 3M FSTMO75 is its advanced retroreflective technology, which significantly enhances visibility in low-light conditions. This is particularly crucial for vehicles and equipment operating in potentially hazardous environments. The retroreflection effect ensures that light from headlights or other sources is redirected back toward the source, making objects and personnel more noticeable to drivers and operators. This feature greatly contributes to overall safety by reducing the risk of accidents.

The FSTMO75 boasts a durable construction, designed to withstand harsh environmental conditions. It is built with high-quality materials that resist wear and tear, ensuring longevity even in rugged settings. This characteristic makes it an ideal choice for use in construction zones, where durability is essential due to exposure to heavy machinery and unpredictable weather.

Additionally, the 3M FSTMO75 incorporates a user-friendly design that facilitates easy application. Whether applied to vehicles, road signs, or equipment, the adhesive backing ensures secure attachment, while its flexibility allows it to conform to various surfaces. This adaptability makes it suitable for diverse applications, from marking vehicles to enhancing the visibility of road hazards.

Another noteworthy characteristic of this product is its ability to provide bright and vibrant colors. The fluorescent options available within the FSTMO75 product line enhance visibility even in daylight, increasing the likelihood that individuals or equipment will be seen from a distance. This is particularly beneficial in public works scenarios where safety is paramount.

In conclusion, the 3M FSTMO75 is a cutting-edge solution for enhancing visibility and safety in various environments. With its advanced retroreflective technology, durable construction, user-friendly application, and vibrant color options, it sets a high standard in the market. Whether in construction, emergency response, or transportation, the FSTMO75 offers essential benefits that prioritize safety and efficiency for users on the job.