Installation
LD-3071/STD
LD-3072/STD
Terreon® Lav Deck™ - 3070 Series
Table of Contents
Components. . . . . . . . . . . . . . . . . . . . . . . . . . . . .2
Supplies Required . . . . . . . . . . . . . . . . . . . . . . . .2
Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
Cleaning and Maintenance . . . . . . . . . . . . . . . . .5
Installation |
IMPORTANT!
Read this entire installation manual to ensure proper installation. When finished with the installation, file this manual with the owner or maintenance department. Compliance and conformity to local codes and ordinances is the responsibility of the installer.
THISE SID UP
Packing List
•
•
•
•
Separate parts from packaging and make sure all parts are accounted for before discarding any packaging material. If any parts are missing, do not begin installation until you obtain the missing parts.
Make sure that all water supply lines have been flushed and then completely turned off before beginning installation. Debris in supply lines can cause valves to malfunction.
Turn OFF electrical power to the electrical outlets, then unplug all electrical units prior to installation. Electrical power MUST remain off until installation is completed. After installation is complete, turn on the water supply first, then turn on the electrical power.
Hardware supplied by installer must be appropriate for wall construction. Wall anchors used must have a minimum
Product warranties and service parts information may be found on our web site at bradleycorp.com.