Installation
Appliance Installation:
1.Hang hood on 2 mounting hooks through the rectangular cutouts on back of hood.
2.Level the appliance, using a carpenters level across bottom of hood with leveling screws in rectangular cutouts.
3.Secure hood with 2 screws on bottom and 2 on top.
Leveling Screw
R e c t a n g u l a r
Cutouts
Leveling Screw
Hooks
Top Fixing Screws
| Bottom Fixing |
Figure 3 | Screws |
Duct | Collar | 4. Connect ducting (Figure 4): |
| ||
|
| |
1” |
| Note: for blower serviceability, leave a gap of 1" minimum between top of |
| transition and sheet metal duct and cover gap with a starting collar wrapped | |
|
| |
|
| around duct and transition. Locate collar screws so they fit into corner of duct |
Transition |
| cover. Secure collar to transition and duct with three sheet metal screws each. |
| Seal with duct tape. | |
|
| |
|
| Be sure to locate screws below damper lines drawn on transition. |
Mark onto exterior of transition the ‚V‘ location of the damper within.
Secure ducting to transition with three sheet metal screws each.
Be sure to locate screws below damper lines drawn on transition.
Seal with duct tape.
| Note: Do not use duct smaller than the transition. |
| Rear discharge: A 90° elbow may be installed immediately above the hood. For |
Figure 4 | serviceability,a mounting similar to the straight up discharge should be used. |
|
6