Hobart AM14C ML-110977, AM14 ML-110976 manual Rate of Exhaust Flow Calculations

Page 9

NOTE: Any listed and labeled factory-built commercial exhaust hood tested in accordance with UL Standard 710 by a nationally recognized testing laboratory, should be installed according to the terms of its listing and the manufacturer's installation instructions.

RATE OF EXHAUST FLOW CALCULATIONS

Based on the 1996 International Mechanical Code.

The Rate of air flow required for a vent hood is calculated using the following definitions (Fig. 6):

Q= Rate of Air Flow in Cubic Feet Per Minute or [ CFM ] Required for the Hood.

A = Area of Hood Opening in Feet2 = (L x W)

D= Clearance Height = Distance in Feet from lower lip of hood to top of dishwasher chamber.

 

 

 

 

 

 

WIDTH

CLEARANCE

LENGTH

 

 

HEIGHT

 

 

 

 

 

 

 

 

P = Perimeter of Hood that is Open. This

 

 

 

 

 

 

depends on the hood design, as follows:

 

 

 

Fig. 6

 

 

Perimeter Calculation Formula

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Hood Design

 

Corner

Wall

Island

 

 

 

 

 

 

 

 

 

 

 

Number of Open Sides

 

2 Sides Open

3 Sides Open

4 Sides Open

 

 

 

 

 

 

 

 

 

 

 

P =

 

L + W

L + W + W

L + L + W + W

 

 

 

 

 

 

 

 

 

 

 

Dimensions

 

Feet

Feet

Feet

 

 

 

 

 

 

 

 

 

 

If there are four open sides (Island Design), the calculation of the Rate is as follows:

Q = 75 x A

If there are three or fewer open sides, the calculation of the Rate is as follows:

Q = 50 x A

As an alternate method, the Rate can be calculated as follows:

Q = 50 x P x D

Example:

L = 3

W = 3

D = 2

 

 

 

 

 

 

 

Rate Calculations

 

 

 

 

 

 

 

 

 

Hood Design

Corner

Wall

Island

 

 

 

 

 

 

 

 

Number of Open Sides

2 Sides Open

3 Sides Open

4 Sides Open

 

 

 

 

 

 

 

 

Q = 75 x A

 

 

675 CFM

 

 

Q = 50 x A

450 CFM

450 CFM

 

 

 

Q = 50 x P x D

600 CFM

900 CFM

1200 CFM

– 9 –

Image 9
Contents Model AM14 & AM14C Dishwashers For Your Safety Table of Contents Model AM14 & AM14C Dishwashers General Installation Codes InstallationUnpacking LocationPlumbing Connections Drain Connection Water RequirementsWater Connection Without Electric or Gas Booster Water HeaterWith Electric Booster Water Heater GAS Tank Heat When SpecifiedVenting Requirements with GAS Tank Heat Rate of Exhaust Flow Calculations Electrical Connections Check Rotation Three-Phase Machines OnlyDishwasher Electric Booster Water HeaterHobart Infrared Booster Gas Water Heater Electrical DataDetergent Dispenser Rinse Aid DispenserChemical Sanitizer Dispenser Rinse Aid and / or Sanitizer Dispenser Fig Preparation OperationDishwashing Cleaning DOs and DONTs for Your NEW Hobart Warewasher Wash Arms MaintenanceRemoving Wash / Rinse Arms AM14 / AM14C MotorsTroubleshooting Manual Reset Button on Pump MotorsSymptom Possible Cause Service