Hobart HCM62 manual Electrical Data, Prestart Check

Page 3

ELECTRICAL CONNECTIONS (Cord Connected Machines)

WARNING: THE ELECTRICAL CORD ON THIS MACHINE IS EQUIPPED WITH A GROUNDING TYPE PLUG WHICH MUST BE CONNECTED TO A PROPERLY GROUNDED RECEPTACLE. IF THE RECEPTACLE IS NOT THE PROPER GROUNDING TYPE, CONTACT AN ELECTRICIAN. DO NOT REMOVE THE GROUNDING PRONG FROM THE PLUG.

Refer to the machine data plate and Electrical Data, below.

ELECTRICAL DATA

 

 

Minimum Circuit Ampacity

 

 

 

Model

Volts / Hertz / Phase

Maximum Protective Device

Receptacle

Plug

 

 

AMPS

 

 

 

 

 

 

 

 

 

 

 

 

 

G

 

HCM61

120 / 60 / 1

20

 

W

Plug: 5-20P

 

 

 

 

 

 

 

 

 

5-20R

 

 

 

 

 

 

 

 

 

 

 

X

 

HCM62

208 - 240 / 60 / 3

20

G

Y

Plug: L15-20P

 

 

 

 

 

 

Z

 

 

 

 

 

L15-20R

 

 

 

 

 

 

 

Compiled in accordance with the National Electrical Code, NFPA70, latest edition.

CHECK MOTOR ROTATION (Three-Phase Machines Only)

On model HCM62, check the rotation. With all parts in their normal operating positions (pages 4 – 5), turn the switch to the Pulse position for two seconds and release. The direction of rotation of the knife should be counterclockwise as viewed from the top.

If the knife rotates clockwise, correct the rotation using the following procedure:

DISCONNECT THE ELECTRICAL POWER SUPPLY. Interchange any two of the incoming power supply leads in the plug. Reconnect the power supply and turn the switch to the Pulse position to verify that the knife rotates counterclockwise as viewed from the top.

PRESTART CHECK

With the machine fully assembled (pages 4 – 5), make sure the cutting blades stop within 4 seconds after the arm is swung back away from the center of the bowl cover.

Make sure the machine cannot be started with the bowl and cover removed but with the arm swung into position above the center of the drive shaft.

If the machine fails to work properly, contact Service; do not allow the machine to be operated.

– 3 –

Image 3
Contents Truct ONS Location InstallationGeneral UnpackingPrestart Check Electrical DataBowl and Knife Assembly Shaft Operation USE of the Feed Tube Using the Bowl Scraper During ProcessingCleaning Preparing the Product for ProcessingService Troubleshooting