INSTALLATION INSTRUCTIONS (continued)
IMPORTANT:
Initial
IMPORTANT:
Complete water line installation before connecting brewer to electrical power.
MAKE SURE THE FRONT PANEL "HEATER ON/OFF" SWITCH IS IN THE OFF POSITION BEFORE CONNECTING BREWER TO ELECTRICAL POWER.
DO NOT turn the HEATER ON/ OFF switch on until the water tank is filled. Heating elements must be completely submerged in water at all times. Damage to the brewer caused by operating the heating elements dry is NOT covered by warranty.
NOTE: Brewer will not operate unless the appropriate WARMER SWITCH is turned ON.
INITIAL SET-UP INSTRUCTIONS
Plumber’s and Electrician’s installation procedures must be completed before proceeding with the
Be sure all electrical connections are secure, and that all plumbing connections are secure and
1. CHECK BREWER FOR PROPER CONFIGURATION
Make sure spray disk gaskets are in place INSIDE of spray heads.
Make sure spray disks are properly installed.
Check hot water faucet for proper operation and leaks. Place empty satellites in position.
2.START BREWER OPERATION
Be sure HEATER ON/OFF switch is OFF, then press POWER SWITCH on back of unit to energize brewer.
Water Inlet Solenoid will energize, filling the tank with water. Fill time is approximately 13 minutes. Tank will fill until water is sensed at the water level probe. Water level will be maintained automatically once the tank is filled.
Press HEATER ON/OFF switch ON. Water in tank will heat to brewing temperature in approximately 30 minutes. When the water temperature reaches the brew temperature set point, the
3.FINAL CHECKS
After initial
Press SATELLITE WARMER switch on. Brewer will not operate unless the appropriate SATELLITE WARMER switch on.
671 76601 Owners Manual 9221 Dual Satellite Brewer