Bunn S/N 0005473 & UP manual Plumbing Requirements, Plumbing Hookup, Plumbing Connections

Page 5

PLUMBING REQUIREMENTS

This dispenser must be connected to a COLD WATER system with operating pressure between 20 and 100 psi (138 and 690 kPa). This water source must be capable of producing a minimum flow rate of 3 fluid ounces (88.7 milliliters) per second. A shut off valve should be installed in the line before the dispenser. Install a regulator in the line when pressure is greater than 100 psi (690 kPa) to reduce it to 50 psi (345 kPa). Also if the install location experiences pressure fluctuations greater than 20 psi (138kPa). The main water inlet is a 3/8” (9.52 mm) male flare.

Additionally, the dispenser’s rinse connection may be connected to a HOT WATER system.

Caution: MAXIMUM RINSE WATER TEMPERATURE: 170 degrees F (76.6 degrees C)

Use BUNN-O-MATIC tubing, part number 34325.10_ _ (see Illustrated Parts Catalog for complete part number) for hot water connection.

The rinse water operating pressure must be between 20 and 100 psi (138 and 690 kPa). A shut off valve should be installed in the line before the dispenser. Install a regulator in the line when pressure is greater than 100 psi (690 kPa) to reduce it to 50 psi (345 kPa). The rinse water inlet is a 3/8” (9.52 mm) barb connection.

NOTE- At least 18 inches (457 mm) of an FDA approved flexible beverage tubing, such as reinforced braided polyethylene, before the dispenser will facilitate movement to clean the countertop. It can be purchased direct from BUNN-O-MATIC (part number 34325.10_ _ [see Illustrated Parts Catalog for complete part number.]) BUNN-O-MATIC does not recommend the use of saddle valves to install the dispenser. The size and shape of the hole(s) made in the supply line(s) by saddle valves may restrict water flow.

NOTE- On early models dispensers without water inlet valve, a water strainer (Bunn-O-Matic part number 23720.1000) should be installed in line, prior to the flexible water line. This strainer is supplied loose with the dispenser.

NOTE - Water pipe connections and fixtures directly connected to a potable water supply shall be sized, installed and maintained in accordance with federal, state and local codes.

This equipment must be installed to comply with the International Plumbing Code of the International Code Council and the Food Code Manual of the Food and Drug Administration (FDA). For models installed outside the U.S.A., you must comply with the applicable Plumbing/Sanitation Code for your area.

PLUMBING HOOKUP

CAUTION: The dispenser must be disconnected from the power source throughout the plumbing hookup.

For early models without the water inlet valve, plumbing connections are located behind the dispenser’s splash panel. Hoses are connected to the water valve(s) and travel under the water bath tank and out the rear of the dispenser. A .38" female flare connector is attached to the hose and connects to the supplied water strainer. The water strainer is shipped loose, taped to the bottom panel.

For late models with the water inlet valve, a hose assembly from the water bath shut-off valve travels over the top of the water bath tank to the product coil and the water inlet valve. A .75" hose to .38" male flare fitting attaches to the water inlet valve.

Hot Water

Connection

(See Caution)

Install Cap

with Hot Water

Connection

Hot Water Rinse Connection

To access the water valves in the front of the dispenser, remove the drip tray assembly; remove the two screws securing the splash panel to the dispenser and remove the splash panel.

Hose assembly to be

replaced after Hot Water Rinse

FIG 1 Plumbing Connections

P2476

5

38218.1 030308

 

Image 5
Contents Phone 217 529-6601 FAX 217 JDF-4BUNN-O-MATIC Commercial Product Warranty User Notices ContentsElectrical Requirements Initial SET-UPCE Requirements Electrical HOOK-UPPlumbing Connections Plumbing RequirementsPlumbing Hookup Sanitize Switch Refrigeration SwitchOperating Controls Water Bath ValveOperating Controls Frozen Concentrates Initial FillLoading Initial Fill Ambient Concentrates Optional Dispenser USEPriming Press and Hold Models Refer to FigWeekly Sanitizing Cleaning & Preventive MaintenanceDaily Parts Washing Cleaning Annually Replace Pump Tubing Cleaning Monthly Clean Condenser Air FilterTemperature Compensated Refractometer Method Adjustment & Optional SettingsTotal Dispense Ratio Set Up Procedure Product Brix % Mix RatioPer 3-second test Pump Speed ProgrammingChilled Water Flow Testing and Adjustment Adjustment & Optional SettingsCup Size Programming Portion Control Dispensers Only Dispenser LockoutService Lockout Adjustment & Optional Settings Password Protection Beeper Fault Dispense Fault ListCooling Fault List DBC display FaultRefill indicator when concentrate out is detected Dip Switch Function ListControls Off Audio feedback during dispenses104 Set Pump 4 RPM Concentrate B Function ListProblem TroubleshootingCold Water Circulation Probable CauseProblem Probable Cause Remedy TroubleshootingRefrigeration Dispenser Locked OutDispense/Rinse switch mem- brane open simultaneously Bottle adapter switch mem- braneWater only Concentrate onlyCant access programming Programming password feature Initial fill/setupPassword Nect fittingsIs powered from the step-down Fault codesOnce water is set, adjust motor Step-down transformerDifficulty brixing and/or weak bev Pump tubing Erage Problem Probable CauseStation Use of portable water pumpCoolant Schematic Diagram Schematic Wiring Diagram Schematic Wiring Diagram JDF-4 Dispense Deck Circuit Schematic Wiring Diagram JDF-4 Control Panel Circuit GND L1 N

S/N 0005473 & UP specifications

The Bunn S/N 0005473 & UP is a remarkable coffee brewing system that blends innovative technology with user-friendly features, catering to both commercial and home brewing needs. Known for its durability and reliability, this model has garnered acclaim among coffee enthusiasts and professionals alike.

One of the standout features of the Bunn S/N 0005473 & UP is its rapid brew technology. This system enables the brewing of high-quality coffee in less time than conventional methods. With a typical brewing cycle of just a few minutes, users can enjoy fresh coffee quickly, making it an ideal choice for busy environments like cafes, restaurants, and offices.

In terms of capacity, this Bunn model is equipped with a generous water reservoir that can hold several gallons, allowing for multiple brewing cycles without the need for constant refilling. This is particularly beneficial in high-demand settings where speed and efficiency are paramount. Furthermore, the system is designed to accommodate a variety of coffee types, from standard drip to specialty blends, providing versatility for users.

The Bunn S/N 0005473 & UP also features an adjustable brewing temperature, ensuring that the coffee is brewed at the optimal heat for extraction. This capability plays a crucial role in achieving the perfect flavor profile, allowing users to experiment with different beans and roasts.

Another notable characteristic of this model is its user-friendly interface. The intuitive controls enable both novice and experienced users to operate the machine with ease, reducing the learning curve associated with brewing great coffee. Additionally, maintenance is simplified with removable components that can be easily cleaned, promoting longevity and consistent performance.

Energy efficiency is also a key consideration in the design of the Bunn S/N 0005473 & UP. With a focus on reducing power consumption, this coffee maker operates discreetly in the background while remaining ready to brew at a moment’s notice.

Overall, the Bunn S/N 0005473 & UP stands out as a reliable and efficient coffee brewing system. With its combination of rapid brew technology, adjustable temperature settings, and user-friendly design, it caters to a wide range of coffee preferences and environments, ensuring that every cup is a delightful experience. This model continues to be a favorite among both casual drinkers and coffee connoisseurs.