Bunn T3A, T6A service manual 10145 072600

Page 29

Page 29

10145

072600

 

 

Image 29
Contents Telephone 217 529-6601 FAX 217 Post Office BOX SPRINGFIELD, IllinoisIntroduction Warranty#00831.0000 #00656.0000 #03408.0000 #03409.0000 User NoticesElectrical Hook-Up Electrical RequirementsPlumbing Requirements Initial SET-UP Fill & Heat Initial Timer AdjustmentOperating Controls Adjusting Brew VolumesON/OFF Switch T3 only Selector Switch T6 only CleaningStart Switch TEA BrewingRemedy TroubleshootingProblem Probable Cause Brew cycle will not start Probable Cause Remedy TroubleshootingProblem Dilution cycle will not start Dilution Solenoid Valve Problem Probable Cause RemedyDripping from sprayhead Spitting or excessive steamingControl Thermostat Drip-out time too long Beverage overflows dispenser Weak beverage Plumbing Lines Water Supply Tank Heater Dry tea leaves remain in the funnelBrewer is making unusal noises Contents ServiceComponent Access Brew Solenoid Valve ServiceSolenoid Valve Terminals Service Brew Solenoid ValveIndication must be Brew TimerIf voltage is present as described, proceed to #4 If continuity is not present as described, refer toIf voltage is as described, proceed to #7 Service Digital Brew Timer Late ModelsDigital Timer Wiring Service Digital Brew Timer Late ModelscontControl Thermostat Dilution Solenoid Valves Test Procedure Disconnect the brewer from the power sourceSource. The indication must be Dilution TimerClockwise With a voltmeter, check the voltage across Limit ThermostatON/OFF or Selector Switch WHI/VIO On left or right position Start Switch Tank Heater 10145 072600 10145 072600 10145 072600
Related manuals
Manual 30 pages 4.71 Kb