Elkay EDFP217FPC, EDFP214FPC, EDFP210FPC dimensions EDFP210FP/EDFP214FP ROUGH-IN Drawings

Page 3

EDFP210FP/EDFP214FP

ROUGH-IN DRAWINGS

FIG. 2

PAGE 3

FINISHED FLOOR

97565C

1. Wall should already be framed for the fountain using dimensions shown in Fig. 1. Shown dimensions pertain to installation location.

 

These dimensions are required for compliance with ANSI Standard A117.1. and ADA (Framing shown for reference only).

 

2. Remove bottom cover from fountain and save the screws.

(Rev.J

3. Install the fountain using bolts and washers (not provided). Tighten securely.

4. Attach drain tube to fountain and cut to required length using the freeze resistant box as a guide.

-

5. Install freeze-resistant box - see box instructions.

8/07)

6. Replace bottom cover.

EDFP210FP*B EDFP214FP*B EDFP217FP*B

Image 3
Contents IMPORTANT! Installer Please Note Installation/Care/Use ManualEDFP210FP/EDFP214FP Mounting Bolt and Access Hole Layout EDFP210FP/EDFP214FP ROUGH-IN Drawings EDFP217FP Mounting Bolt and Access Hole Layout EDFP217FP ROUGH-IN Drawings EDFP210FP*B EDFP214FP*B EDFP217FP*B Cable Sheath Adjustment Operation of Quick Connect Fittings Parts List