Grindmaster PM4-B, PM45-B instruction manual › › ›, Filling the Ice bank with Water

Page 4

WARNING: Only a qualified service technician should service internal electrical components.

Installing Your Unit (cont.)

4.Water Hook-up.

It is recommended to provide water connection to the dispenser from a dedicated water line. Without this, consistent water pressure necessary to sustain proper brix levels may not be maintained due to water surges caused by other water-consum- ing equipment, such as dishwashing machines, other dispensing equipment, coffee machines etc!

The water line supply should be at least 3 2/5” (8 mm) internal diameter and must be rated for 217 psig (15 bar) pressure at 70ÞF (21°C) water temperature.

Install a water pressure regulator gauge at the inlet to the machine and set it to

29 Psig (2 bar). The water pressure regulator gauge, is included in the Accessory Box. It is important that the gauge is installed accordingly. (See figure A) Failure to comply will damage the gauge and render it inoperable.

(Figure A)

Filling the Ice bank with Water

1.Remove the rear upper panel from the dispenser.

2.Find the Ice Tank Plug (round black rubber plug about 1” (2.5 cm) diameter) on the top of the ice bank cover and remove it.

3.Use the water hose or funnel to fill the tank with cold tap water (18 liters.)

4.Stop filling water once water is flowing from overflow drain.

5.Look at the water level gauge (tank drain clear hose attached to the insulated refrigeration line in upright position.) The water level in the tank is equal to the water level in the water gauge and should be about 1.5 cm below ice bank cover. *(see Figure B)

6.Replace rubber plug and rear upper panel.

Back of unit

Ice Tank Plug

Water Level

1.5cm below top cover

Water Level Gauge

Overflow

Drain

 

Air Out

 

› › ›

7.Turn the power switch ON.

*To assure the proper operation of the dispenser, the water level in the ice bank must be kept at the full fill level explained above. Water level in the ice bank should be checked every couple of months.

Air In

(Figure B)

Minimum Air Space Requirements

Top 12”

Sides 2”

Back 4”

WARNING: Do not remove the water level gauge from its position unless you want to drain the water from the ice bank.

Note: If the water level in the ice bank falls substantially (about 2”/5 cm), the refrigeration system will stop operating. Before this happens, the loss of cabinet cooling will be observed.

Page 4

Crathco® Post Mix Beverage Dispensers

 

 

Image 4
Contents Crathco Post Mix Beverage Dispensers Introduction Installation Installation NoticeInstalling Your Unit Unpacking› › › Filling the Ice bank with WaterOperating and Adjustments SpecificationsBrix Setup Explanation of termsBrix Set Procedure Dispenser Operation Tips Washing PartsProduct Pumps System Cleaning Figure FSanitizing Preventing Unauthorized Dispensing During Off HoursMaintenance Troubleshooting Troubleshooting con’t Does ICE-BANK have no ICE or Partial ICE Around Coil Troubleshooting con’t Troubleshooting con’t Troubleshooting con’t Final Assembly Exploded DescriptionCondensing Unit Exploded View Replacement Pump Kits MAY be Ordered AS Follows Dispensing Base Exploded ViewRefrigeration System Exploded View Evaporator ASSEMBLY/CABINET Cooling Pump Exploded View Upper Cabinet Exploded View Accessory KIT Exploded View Merchandiser Exploded ViewCrathco Post Mix Beverage Dispensers Crathco Post Mix Beverage Refrigeration Diagram Plumbing Diagram

PM45-B, PM4-B specifications

The Grindmaster PM45-B and PM4-B are two advanced machines designed for high performance in the coffee grinding industry. Both models have been engineered to cater to the needs of coffee enthusiasts and commercial establishments alike, making them ideal for cafes, restaurants, and specialty coffee shops.

One of the standout features of the PM45-B is its high-capacity grinding capability. Equipped with a powerful motor, this model allows for continuous operation, making it essential for busy environments where efficiency is key. The PM4-B, while slightly smaller, still offers impressive output, making it suitable for smaller setups or those with less demand without compromising on quality.

Both models incorporate precision-engineered burr grinders, which ensure a uniform grind size. The ability to control the grind size is crucial for brewing methods ranging from espresso to French press. Users can easily adjust the grind settings, providing versatility in coffee preparation and enhancing the flavor extraction during brewing.

Another important characteristic of the PM45-B and PM4-B is their innovative technology, including digital displays and programmable settings. These features enable baristas to save their preferred grind settings for different coffee types. This level of customization results in improved consistency, allowing users to replicate their favorite brew every time.

Durability is a hallmark of both the PM45-B and PM4-B, as they are made with high-quality materials that withstand heavy use. The robust construction ensures that these machines can endure the rigors of a commercial setting while maintaining performance over time.

Additionally, both grinders are designed with easy maintenance in mind. The accessible design of the burrs allows for quick cleaning, enabling operators to ensure hygiene and efficiency without lengthy downtime.

In summary, the Grindmaster PM45-B and PM4-B represent a blend of innovative technology and user-centric design. With their powerful motors, precision grinding capabilities, digital controls, and durable construction, these machines stand out in the market for anyone serious about coffee grinding. Whether for a bustling café or a smaller establishment, these grinders provide quality, reliability, and versatility, ensuring the perfect cup of coffee every time.