GE Monogram ZFSB23DSS Install Water Line, To move the refrigerator indoors

Page 7

Installation Instructions

 

 

 

 

 

 

 

STEP 1

 

ALL MODELS (continued)

REINSTALL DOORS

 

 

 

 

 

Refer to the illustration on page 5 or 6.

 

To move the refrigerator indoors:

• Carefully, route the water line tubing and electrical

 

• Place a piece of the carton or soft cloth against the

through the freezer side bottom hinge. Lower the door

 

 

side panel of the refrigerator to pad and protect the

onto bottom hinge.

 

 

stainless steel finish.

• Secure top hinge.

 

• Place the refrigerator on the handtruck with a side

• Insert the tubing all the way into the coupler.

 

 

against the truck only.

• Reconnect the wiring harness.

 

• Move the refrigerator indoors.

• Replace top cap with original screws and springs

 

 

 

 

 

(where present).

 

 

 

 

 

Follow the same procedure to reinstall the fresh food door.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INSTALL WATER LINE

 

 

 

STEP 2

 

A cold water supply is required for automatic icemaker operation. The water pressure must be between 40 and 120 p.s.i.

Route GE SmartConnectRefrigerator Tubing or 1/4" OD copper tubing between house cold water line and the water connection location.

Measure the distance from the water valve on the back of the refrigerator to the water supply line. Add 8 foot length to allow the refrigerator to be moved away from the wall after installation. Bend the tubing into 3 coils of about 10".

NOTE: The only GE approved plastic tubing is supplied in GE SmartConnectRefrigerator Tubing kits. Do not use any other plastic water supply line because the line is under pressure at all times. Certain types of plastic will crack or rupture with age and cause water damage to your home.

GE SmartConnectRefrigerator Tubing Kits are available in the following lengths:

2' (0.6 m)

– WX08X10002

6' (1.8 m)

– WX08X10006

15' (4.6 m)

– WX08X10015

25' (7.6 m)

– WX08X10025

Shut off the main water supply.

Turn on the nearest faucet long enough to clear the line of water.

Install a shut-off valve between the icemaker water valve and cold water pipe in a basement or cabinet. The shut-off valve should be located where it will be easily accessible.

Turn on the main water supply and flush debris.

Run about a quart of water through the tubing into a bucket. Shut off water supply at the shut-off valve.

NOTE: Saddle type shut-off valves are included in many water supply kits, but are not recommended for this application.

NOTE: Commonwealth of Massachusetts Plumbing Codes 248CMR shall be adhered to. Saddle valves are illegal and use is not permitted in Massachusetts. Consult with your licensed plumber.

7

Image 7
Contents Monogram.com Installation InstructionsBefore YOU Begin ContentsAir Circulation Clearances Installation SpaceInstallation in a corner Additional SpecificationsImportant Please read carefully Tools Required FlooringMaterials Required Grounding the RefrigeratorMove Refrigerator Indoors Model ZFSB25Model ZFSB23 Move Refrigerator Indoors Shut off the main water supply Install Water LineTo move the refrigerator indoors Against the truck onlyConnect Water Supply Connect PowerMove Refrigerator Into Position Screw Down Support LEG To Adjust the RollersLevel the Refrigerator Level the DoorsInstall Toekick Temperature ControlsStart Icemaker Page GE Consumer & Industrial