Installation |
^Secure the mounting plate to the ceil- ing using the 8 x 60 lag bolts. Once tight, make sure that the mounting plate can safely support the weight of the hood.
^Pull the power cord through its cut out on the flange of the chimney.
^Using at least two people, lift the hood and guide the spring clips through their respective slots in the flange at the top of the chimney. Make sure they click into place and that the hood is hanging securely from the spring clips before allowing them to carry the weight.
28