INSTALLATION
Walldrillingandbracketfixing
|
| 1÷2 |
7.2.1 |
| X |
|
| |
11 | 116 | 116 |
12a |
| 310 |
|
| |
650 min. |
|
|
Wallmarking: |
|
|
|
|
|
• Drawaverticallineonthesupportingwallupto |
| theceiling,orashighaspractical,atthe | |||
centreoftheareainwhichthehoodwillbeinstal |
| led. |
| ||
• Drawahorizontallineat650mmabovethehob. |
|
|
| ||
• Placebracket | 7.2.1onthewallasshownabout12mmfromtheceiling | orupperlimitalign | |||
ingthecentre(notch)withtheverticalreference |
| line. |
| ||
• Markthewallatthecentresoftheholesinthe | bracket. |
| |||
•Placebracket | 7.2.1onthewallasshownatXmmbelowthefirstbrack | et(X=heightofthe | |||
upperchimneysectionsupplied),aligningthecentr | e(notch)withtheverticalline. | ||||
•Markthewallatthecentresoftheholesinthe | bracket. |
| |||
•Markareferencepointasindicatedat116mmfr |
| omtheverticalreferencelineand310mm | |||
abovethehorizontalreferenceline. |
|
|
| ||
•Repeatthisoperationontheotherside. |
|
|
| ||
•Drillø8mmholesatallthecentrepointsmark | ed. |
| |||
•Insertthewallplugs | 11intheholes. |
|
|
| |
•Fixthelowerbracket | 7.2.1usingthe 12ascrews(4,2x44,4)supplied. |
|
•Fixtheupperbracket 7.2.1andtheairoutletconnectionsupport 7.3togetherusingthe2 screws 12a(4,2x44,4)supplied.
•Insertthetwoscrews 12a(4,2x44,4)suppliedinthehoodbodyfixinghole s,leavingagap
of56mmbetweenthewallandtheheadofthescre w.
EN |
| 1 |
| 16 |