Scotsman Ice CU50 service manual Refrigeration Service

Page 30

CU50

Service Manual

Refrigeration Service

This ice machine use R-134a type refrigerant. There are specific rules for handling that refrigerant.

To check for system pressures, add a field supplied clamp-on type service valve as a temporary means of system access. After diagnosis and before final repair, replace the clamp-on type valve with valves that are brazed onto the process tubes of the system.

Use a low flow of dry nitrogen when brazing on the system.

Install a new filter drier when replacing a refrigeration component or after a refrigerant leak repair.

Evacuate the system to at least 300 microns and use a micron gauge to measure the evacuation level.

Weigh in the nameplate charge. The machine is critically charged and a partial ounce mis-charge will affect performance.

March 2010

Page 30

Image 30 Contents
Table of Contents IntroductionSpecifications Powercord Cabinet LayoutAir flow Installation Overview Water QualityFilters and Treatment Door swing change Installation Notes Installation Water & Drain Drain Pump Model drain installationGravity Drain Installation check list ElectricalInitial Start Up Cube Size Adjustment Cube Size Change TableHarvest Time Adjustment Harvest Time TableControl Settings Automatic water purge enable / disableReset time to clean indicator light Use How to clean the condenser and winterize Condenser cleaningHow to remove scale from the ice making system Electrical Components System InformationElectrical Sequence Bin controlWater System Components Controller Maximum Harvest Time minutesPerformance Information Refrigeration System TimeDischarge Pressure Thermistor Values Deg. F · Ohms Deg. F. · OhmsService Diagnosis Problem Likely Cause Probable SolutionMakes excessive noise Removal and Repair Control Panel Evaporator ThermistorController TransformerRemoval and Repair Cabinet Removal CU50 Refrigeration Service