ELECTRIC STATIONARY KETTLES
INSTALLATION
UNPACKING
This kettle was inspected before leaving the factory. The transportation company assumes full responsibility for safe delivery upon acceptance of the shipment.
Immediately after unpacking, check for possible shipping damage. If kettle damage is found, save the packaging material and contract the carrier within 15 days of delivery.
LOCATION
Stationary Kettle
Position the kettle in its final location. Check that there are sufficient clearances for operating and servicing the kettle, and proper clearance of the cover when raised. The kettle
Tilting Kettle
INSTALLATION CODES
AND STANDARDS
In the United States, Vulcan kettles must be installed in accordance with:
1.State and local codes
2.NFPA Standard
3.National Electrical Code (ANSI/NFPA No.70, latest edition) available from the National Fire Protection Association (NFPA), Batterymarch Park, Quincy, MA 02269
In Canada, Vulcan kettles must be installed in accordance with:
1.Local codes
2.Canadian Electrical Code (CSA C22.2 No.3, latest edition) available from the Canadian Standards Association, 5060 Spectrum Way, Mississauga, Ontario, Canada L4W 5N6
Position the kettle in its final installed location to provide drainage directly below pour path, with sufficient rear clearance from the wall to allow the kettle to tilt completely without obstruction.
— 5 —