GE JVB65, JVB34 Plan the Wiring, Preparation, Changing Blower Discharge Optional, Down Discharge

Page 9

Plan the Wiring

1.The downdraft blower system draws 4 AMPS and requires a 120 VAC, 60 Hz circuit.

2.The unit has a 2 ft. long power cord with a

3-pronged plug. Plan to provide a grounded outlet in a location which will allow the unit’s power cord to reach. The outlet cannot be located on a back wall. The outlet needs to be mounted on the side wall of the cabinet or it could be on the back wall of an adjacent cabinet with access through an opening in the side wall. (Based on local codes.)

Preparation

Changing Blower Discharge (Optional)

The blower is shipped with its discharge facing DOWN. Follow these steps ONLY if:

The position of the blower discharge needs to be moved so the ductwork does not interfere with the floor joists, plumbing or wiring below.

It is necessary to rotate the blower discharge to the RIGHT or LEFT.

Place the unit on its back on a table or work surface.

DOWN DISCHARGE–

Moving Blower Left or Right

Sheet metal screw

Blower

Nuts

 

 

 

 

 

 

 

 

 

 

Bottom

Clamp channel

flange

 

 

1.Loosen the 4 nuts and 2 clamp channels.

2.Slide the blower to the desired position.

3.Use the supplied cover plate to close the open space (if any).

4.Tighten the nuts to secure the top of the blower and use the sheet metal screws through the bottom flange to secure the bottom of the blower.

LEFT OR RIGHT DISCHARGE

 

 

 

Nut

 

Blower

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Motor plug

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Clamp

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sheet

channel

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

metal

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

screw

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cover plate

1.Remove the 4 nuts and 2 clamp channels.

2.Loosen the screws holding the gear motor cover and slide it away from the blower.

3.Carefully lift the blower and disconnect the motor plug if necessary. Reposition the blower and reconnect the motor plug.

4.Use the supplied cover plate to close any open space.

5.Replace the clamp channels and use the nuts to secure the blower in its new position.

6.Reposition the gear motor covers and tighten the screws.

7.Use sheet metal screws through the bottom flange to secure the bottom of the blower.

(continued next page)

9

Image 9
Contents Care and Cleaning Consumer ServicesOperating Instructions, Tips Important Safety Instructions Installation Instructions for General Electric HoodIf You Need Service Servicing Using Your Downdraft Vent SystemCooking Tips ControlsQUESTIONS? USE this Problem Solver Care and CleaningRequirements for an approved installation Installation InstructionsSpecifications Take MeasurementsJVB34, JVB35, JVB93 30″ COOKTOPS/DOWNDRAFT UnitsJVB64, JVB65, JVB96 36″ COOKTOPS/DOWNDRAFT UnitsSteps to Determine Flexible Ducting’s Equivalent Length Plan the DuctworkPreparation Plan the WiringChanging Blower Discharge Optional Down DischargeInstall the Downdraft Install the DuctworkInstall the Electrical Wiring Adjust the Switch Install the CooktopWarranty