11. TEST AND CHECKOUT PROCEDURES, AND TROUBLESHOOTING
CAUTIONS
1.DISCONNECT THE POWER SUPPLY CORD FROM THE OUTLET WHENEVER REMOVING THE OUTER CASE FROM THE UNIT. PROCEED WITH THE TEST ONLY AFTER DISCHARGING THE HIGH VOLTAGE CAPACITOR AND REMOVING THE LEAD WIRES FROM THE INVERTER MODULE.
2.ALL OPERATIONAL CHECKS WITH MICROWAVE ENERGY MUST BE DONE WITH A LOAD (1 LITER OF WATER IN CONTAINER) IN THE OVEN.
A.TEST PROCEDURES
COMPONENTS | TEST PROCEDURE | RESULTS |
INVERTER
(Lead wires removed)
CN702
Heat Sink
E701
120V AC
CN701 | High Voltage |
| Output to |
| Magnetron |
| CN703 |
| Control Signal |
| In/Out |
Note: Do not try to repair the inverter board, nor try to make any adjustments to the board.
Check wiring to the inverter:
1.Unplug the oven’s main power supply.
2.Visually inspect 4 connectors on the inverter board: CN701, CN702, CN703, E701 to see whether there are any signs of failure due to loose wires, bad crimping, sign of overheating, etc.
MAGNETRON | 1. Measure the resistance. |
| |
(Lead wires removed) | Normal: Less than 1 ohm | ||
| |||
|
| ||
| • Filament terminal |
| |
| 2. Measure the resistance. | Normal: Infinite | |
| |||
|
| ||
| • Filament to chassis |
|