3Com 43506 AIR Conditioning Start UP Procedure Crankcase Heaters, Fresh AIR Damper Assembly

Page 12

FIGURE 5

FLAME SHOULD

GROUNDENGULF SENSOR STRAP

IGNITER

SENSOR

MIS-1067

FIGURE 6

HEAT

EXCHANGER

SECTION

NO LIFTING AWAY FROM BURNER PORTS

OUTER CONE

INNER

CONE

SECTION 7 • AIR CONDITIONING START UP PROCEDURE CRANKCASE HEATERS

Single and three phase models have an insertion well-type heater located in the lower section of the compressor housing. This is a self-regulating type heater that draws only enough power to maintain the compressor at a safe temperature.

Some form of crankcase heat is essential to prevent liquid refrigerant from migrating to the compressor, causing oil pump out on compressor start-up and possible valve failure due to compressing a liquid.

The decal in Figure 7 is affixed to all outdoor units detailing start-up procedures. This is very important. Please read carefully.

FIGURE 7

IMPORTANT

These procedures must be followed at initial start-up and at any time power has been removed for 12 hours or longer.

To prevent compressor damage which may result from the presence of liquid refrigerant in the compressor crankcase.

1.Make certain the room thermostat is in the “off” position (the compressor is not to operate).

2.Apply power by closing the system disconnect switch. This energizes the compressor heater which evaporates the liquid refrigerant in the crankcase.

3.Allow 4 hours or 60 minutes per pound of refrigerant in the system as noted on the unit rating plate, whichever is greater.

4.After properly elapsed time, the thermostat may be set to operate the compressor.

5.Except as required for safety while servicing—Do not open system disconnect switch.

7961-061

SECTION 8 • FRESH AIR DAMPER ASSEMBLY

The fresh air damper assembly permits outside fresh air to be introduced to the building whenever the main unit comfort air blower is operating. The damper blade may be set to one of four positions: 1) full open, 2) 50% open, 3) full closed, or 4) automatic (barometric) operation. In the latter set-up the damper blade will open and close as the main comfort air blower cycles on and off. Reference Figure 8 for details on damper positions.

There is also a cleanable filter installed at the bottom opening of the fresh air damper that requires periodic cleaning. The cleaning interval will be dependent upon frequency of unit operation and local air conditions. See Figure 3 for Fresh Air Damper and filter locations.

FIGURE 8

FULL OPEN

NORMAL BAROMETRIC

POSITION

50% OPEN FIXED POSITION. (2) ADDTIONAL CANOE CLIPS ARE TAPED TO THE INSIDE OF

DAMPER ASSEMBLY

TOTALLY CLOSED

POSITON

MIS-957

Manual 2100-279 Page 10

Image 12
Contents What to do if YOU Smell GAS Bard Manufacturing CompanyContents Important Safety Precautions GAS and Combustion Products Hazard Alert SymbolSignal Words Safety PrecautionsManual 2100-279 Understanding HOW Your Furnace Works Turning OFF Furnace in AN Emergency GAS and Electrical Shutoff DevicesPossible Emergencies Recommended Actions ActionOperating Your Furnace Proper Maintenance of Your Furnace Remove the burner access door. See Figure MIS-058 MIS-059 AIR Conditioning Start UP Procedure Crankcase Heaters Fresh AIR Damper AssemblyReplacement Parts

43506 specifications

The 3Com 43506, also known as the 3Com SuperStack 3 Switch 4400, is a robust networking solution designed for small to medium-sized enterprises that require a reliable and efficient way to manage their network traffic. This managed switch offers a variety of features and technologies that cater to both performance and flexibility, making it a popular choice in the industry.

One of the standout features of the 3Com 43506 is its ability to support Layer 2 and Layer 3 switching. This means that it can efficiently manage data packets at both the data link and network layers, ensuring optimal traffic management and routing. This versatility is essential for organizations that need to segment their networks and control the flow of information between different departments or units.

The 3Com 43506 utilizes advanced switching technology that includes high-speed Ethernet connections, specifically 10/100/1000 Mbps rates on all ports. This enables the switch to handle large volumes of traffic without bottlenecks, making it ideal for bandwidth-heavy applications such as video conferencing or large file transfers. With its multiple Gigabit Ethernet ports, users can also connect high-performance servers and storage devices directly to the switch, enhancing overall network speed and reliability.

Quality of Service (QoS) is another significant feature of the 3Com 43506. This technology allows network administrators to prioritize certain types of data, ensuring that critical applications receive the bandwidth they need for optimal performance. For organizations that rely on voice-over-IP (VoIP) or real-time video services, QoS is invaluable for maintaining clear audio and video quality.

In terms of management, the 3Com 43506 offers comprehensive support for Simple Network Management Protocol (SNMP) and web-based management interfaces, providing network administrators with the tools to effectively monitor and configure the switch. The device also supports virtual LANs (VLANs), which enhance network security and efficiency by allowing the segmentation of network traffic.

Moreover, the 3Com 43506 is designed with reliability in mind. It features dual power supply support for redundancy, ensuring continued operation even in the event of a power failure. Its fanless design contributes to quiet operation, making it suitable for deployment in office environments where noise levels must be kept to a minimum.

Overall, the 3Com 43506 is a versatile and feature-rich switch that meets the demands of modern networking environments. Its combination of performance, advanced management features, and reliability makes it an excellent choice for businesses looking to enhance their network capabilities.